Route on the aerial image
Set, move and delete points; straights between the points, bends at the corners. The other locations of the project lie underneath for snapping.
Draw the cable route on the aerial image and set joints – the tool splits the route into pulls, fetches the elevation profile and calculates the pulling force section by section in both directions against the permissible force of the cable.
Register for free Read more in the manual
1 location free, no payment details. Runs in the browser – nothing to install. Try it without registering
Set, move and delete points; straights between the points, bends at the corners. The other locations of the project lie underneath for snapping.
A pull ends at every joint and the next one begins. For each pull the tool gives length, force and the better direction.
The ground level at the route points comes from the terrain model; gradients enter the pulling force, crests and dips are marked.
Cable length per pull with allowances at joints and ends; with a delivery length the tool allocates the pulls to drums.
The formulas are those of static and belt friction (Euler-Eytelwein). The permissible forces are common values from manufacturers' installation notes; for the cable used, the data sheet applies. Formulas and tables are in the manual. Go to the chapter in the manual
80 m straight, 90° bend with 2 m radius, 40 m straight – one cable at 2.5 kg/m. The figures are calculated by the same engine as in the application – when this page is opened.
| Quantity | Result | Calculation |
|---|---|---|
| Pulling force from the long end | 1.53 kN | (2.5 · 9.81 · 0.35 · 80) · e^(0.35 · π/2) + 2.5 · 9.81 · 0.35 · 40 |
| Pulling force from the short end | 1.28 kN | the same calculation in the other direction: the bend comes earlier in the pull |
| Better pulling direction | from the short end | 16 % less pulling force |
| Permissible pulling force | 18.00 kN | from pulling method, conductor material and cross-section – or the manufacturer's value |
| Sidewall pressure in the bend | 297 N/m | force at the end of the bend ÷ radius, in the better direction |
A bend multiplies whatever is already pulling on the cable before it. That is why the tool always calculates both directions.
No login, nothing saved: enter values, and the result is calculated by the same engine as in the application.
Level route with at most two bends, without a check against the permissible force of your cable. In a project: route on the aerial image, elevation profile, joints, permissible force, delivery lengths.
What the tool does not do – so that it is clear what the result is good for. Results are planning aids, not construction documents.
From the side where the bends come early in the pull. A bend multiplies the force already acting before it – if it comes at the end of a long straight, the force is greatest. The tool calculates both directions and names the better one.
From the terrain model: for several federal states from the surveying authorities' elevation services, otherwise from a nationwide elevation model. The source is shown at the profile.
Yes. The editor creates the cable route per pull, a joint pit per joint and drum and winch sites per pull. The size of the sites is a placeholder you adjust in the plan.
All tools work at the same location with the same coordinate – what is created in one is available in the next.
One location free, all tools. No credit card, no subscription.
Register for free