Skip to content

11 Cable route and cable pulling

The pulling force when installing a cable: section by section over straights, gradients and bends, in both pulling directions – compared with the permissible pulling force of the cable.

Creating, calculating, saving

  • Create: on the location page, the card Cable route and cable pulling › Create cable pull and calculate. There is one cable pull per location; the card then shows route length, maximum pulling force, permissible pulling force, utilisation and sidewall pressure, and Open takes you back.
  • Calculate: at the left the inputs in three groups – Cable, Pull, Route –, at the right the result. Every change is calculated immediately. For an input that is not permitted, the page names the field and the range; the last valid result stays visible, faded.
  • Save or CtrlS stores inputs and result at the location; the time is shown next to it. If someone else has saved in the meantime, the page reports this and overwrites nothing.
  • Delete: on the location page in the menu ⋯ of the card. With the location, its cable pull is deleted, moved or archived as well.
  • Whoever has read-only access in the project can view and calculate but not save.

Route on the aerial image, joints and pulls

Cable route and cable pulling: route on the aerial image with five points, one joint, drum and winch site per pull and the levels of the points, below it the elevation profile of the ground surface
The route on the aerial image with a joint (M1), below it the elevation profile from the terrain model.

Above the form lies the map with the aerial image around the location (it needs coordinates for that). Yellow is this location, white are the other locations of the project.

  • Set point: every click sets the next point of the route. Move point drags a point, Delete point removes it, undo last point and Clear route tidy up. Dragging pans the map, mouse wheel or +/− zooms, show all fits.
  • Set joint: tap a point of the route – a joint sits there (M1, M2 …). At a joint one pull ends and the next begins; tapping again removes it.
  • What results: straights between the points, at every kink a bend with the bend radius at the kinks. Every pull is calculated on its own in both directions; the table Route and pulls gives per pull length, bends, the more favourable pulling direction (where the drum stands), maximum pulling force, utilisation, cable per length and – with a roller spacing – the cable rollers. On the map every pull carries the colour of its verdict; T and W show drum and winch site.
  • Cable lengths: length of the pull plus the allowance per cable end – at a joint and at the start or end of the route (termination, reserve), according to the installation instructions. With three single-core cables the length counts three times.
  • Levels from the terrain model: fetches, for every point of the route, the ground level from the official elevation model. This gives the height difference per stretch – it enters the pulling force (harder uphill, easier downhill) and can reverse the more favourable pulling direction. Between two points the route runs straight. Below the map the elevation profile along the route appears: brown the ground surface (read from the elevation model every few metres), blue dashed the straight lines the calculation uses. Where the ground deviates by 0.5 m or more, Adopt crests and dips as points sets points with their levels there – the largest pulling force can occur at a crest, not at the end. Vertical deflections at crests and dips are not calculated as bends. If the route changes, the levels no longer apply and have to be fetched again. What is meant is the ground surface, not the trench bottom.
  • Insert a point: a click on a stretch of the route inserts a point there (otherwise a click appends the next point to the end). The joints stay at their points.
  • Delivery length per drum: with it the calculator checks whether the cable length of every pull (with the allowances) fits on one drum – a longer pull is an error: set or move a joint. If everything fits, it distributes the lengths over drums (by size, each length on the first drum with room) and states number, allocation and remainder; “arithmetically at least” is the sum divided by the delivery length. The distribution is simple and traceable, not in every case the smallest possible number. If the location has a cable drum, the comparison checks its length against the longest pull.
  • Values between the cable construction tools: the trench tool is offered the length of the whole route (all pulls together), the cable drum tool the cable length of the longest pull including allowances, and the cable pulling tool takes cable diameter, weight and the length on the drum as the delivery length from the cable drum tool. The comparison trench ↔ route compares with the whole route.
  • Across several locations: the map shows the saved routes of the other locations of the project as grey dashed lines (“Route Mast 4”). A new or moved point near them snaps exactly onto one of their points, onto a neighbouring location or onto this location – this is how the route of one location joins that of the next. Calculation remains per location.
  • Without a route on the aerial image the sections entered apply as before (one pull); with a route they rest.

Tangent length t = R · tan(φ ÷ 2) · arc length = R · φ · straight between two points = distance − t of the adjacent bends

Cable per pull = length of the pull + allowance at both ends · cable rollers = length of the straights ÷ roller spacing (rounded up) + 1, plus one corner roller per bend

Adopt into the sequence plan: in the site layout tool of the location the section Cable pull is found on the right under Project. Adopt the cable pull of this location creates: the cable route per pull (cable / line), a joint pit per joint in the size entered, a drum site and a winch site per pull beside the route. The objects can be moved there, assigned to construction phases and equipped; adopting again replaces those adopted before. The plan needs a position reference.

Limits: without fetched levels the route lies in the plane of the map. Lengths and angles are as accurate as aerial image and click. The size of drum and winch site in the sequence plan is a placeholder. Allowances, roller spacing and pit size are your values – the page knows no standard values for them.

Inputs

Cable weight, outer diameter
weight of one cable in kg/m (data sheets often state kg/km – divide by 1000) and diameter over the sheath in mm.
Conductor cross-section, conductor material
all conductors of one cable together in mm², without screen and concentric conductor – for 4 × 150 mm² that is 600. Copper or aluminium determines the permissible tensile stress.
Cables in the pull
one cable or three single-core on a common pulling grip. The weight counts three times; for the permissible pulling force three cables count when laid up, two when not.
Pulling method and cable type
determines the permissible pulling force: pulling eye on the conductors, pulling grip depending on cable type – or enter the manufacturer's value in kN yourself.
Friction coefficient μ
between cable and duct, rollers or trench bottom. It decides the result and is an assumption: default 0.35 (conservative). Guide values are shown below the field.
Pulling force at the start
in N: what already pulls on the cable at the drum position – pay-off resistance and brake of the drum. Empty means 0.
Smallest bending radius
during pulling, as a multiple of the cable diameter; commonly 15 for single-core, 12 for multi-core cables. If empty, it is not checked.
Permissible sidewall pressure
in N/m, as stated by the cable manufacturer. If empty, the calculator only displays the pressure.
Route
up to twelve sections in order from the drum position to the winch: Straight with length and height difference (uphill positive, downhill negative) or Bend with deflection angle and radius. Rows without a selection do not count.

Result

  • Four tiles: maximum pulling force in the more favourable pulling direction, permissible pulling force with utilisation, length of the route with the sum of the bends, highest sidewall pressure.
  • Pulling force along the route: both pulling directions as lines, the bends shaded, the permissible pulling force dashed. The route runs from left to right in the order entered – the pull against the order therefore starts at the right.
  • Checklist: pulling force, pulling direction, bending radius, sidewall pressure, downhill gradient. Each item is met, note, check or not permitted. From 80 % utilisation it says “check”: slightly higher friction then exceeds the limit.
  • Two tables, one per pulling direction – the more favourable first: every section with its calculation, the pulling force at its end and the sidewall pressure in the bend. Copy values (for Excel) Subscription and Download as PDF Subscription output them.
  • Permissible pulling force with the formula it comes from, and the smallest bending radius.

Purpose, assumptions and limits

Purpose
To estimate before pulling whether a cable passes through the route in one pull, from which side to pull and where intermediate drives, lubricant or a cable pit are needed.
Typical use
Cable pulling in ducts and on rollers in an open trench; choice of pulling direction; length of the part sections between pits; sizing of winch and pulling rope; comparison with and without lubricant.
For whom
Cable and grid construction, work preparation, site management.
Units
Lengths and radii in m, cable diameter in mm, cross-section in mm², weight in kg/m, angles in degrees, forces in N and kN (1 kN ≈ 100 kg of pull), sidewall pressure in N/m. Decimal comma and decimal point are both accepted.
Assumptions
  • Steady pull without jerks or stops; the friction coefficient is the same along the whole route.
  • Bends lie horizontally; the cable's own weight in the bend is neglected. This is customary as long as the pulling force is large compared with weight times radius.
  • On an uphill gradient the whole weight of the section pulls as well, downhill it helps. If the calculated pulling force becomes negative, the cable runs by itself – the calculation continues with 0 and the checklist says so.
  • The pulling force at the start acts like a brake: it runs through every bend and is multiplied there.
Technical limits
  • The friction coefficient is the greatest uncertainty. In a bend it is in the exponent: with 0.25 instead of 0.35, the factor at 90° becomes 1.48 instead of 1.73. Always calculate with a higher value as well.
  • Not included: several cables in one duct with jamming, vertical bends with a weight component, intermediate drives (cable pushers), elongation of rope and cable, water in the duct.
  • The permissible pulling forces are customary values from a cable manufacturer's installation notes. For the cable actually used, the data sheet applies – enter the manufacturer's value.
  • The calculator does not state a fixed limit for the sidewall pressure; it depends on the cable type.
  • Permitted inputs: weight 0.05 to 100 kg/m, diameter 5 to 250 mm, cross-section 1.5 to 5000 mm², friction coefficient 0.01 to 1, straight 0.1 to 10,000 m, angle 1 to 360°, radius 0.1 to 500 m.
Regulations
Permissible pulling forces and bending radii for power cables are governed by the DIN VDE 0276 series of standards and the manufacturers' data sheets. The values in the calculator come from installation notes and data sheets of cable manufacturers that reproduce these rules – not from the text of the standard. The formulas are those of sliding and belt friction (Euler–Eytelwein).
Data protection
What is stored: the inputs, a summary of the result and who saved when – at the location, visible to everyone allowed to open the project. The calculator does not ask for personal data. More in the privacy policy.

Calculation method, formulas and example

The pulling force grows from section to section; the force at the end of one section is the force at the start of the next. With weight m in kg/m, friction coefficient μ and g = 9.81 m/s²:

Straight, length L, height difference Δh:   F₂ = F₁ + m · g · (μ · √(L² − Δh²) + Δh)

Bend, deflection angle φ in radians, radius R:   F₂ = F₁ · e^(μ · φ)      sidewall pressure = F₂ ÷ R

On the level (Δh = 0) this leaves F₂ = F₁ + m · g · μ · L. A bend multiplies whatever already pulls on the cable before it – which is why bends belong at the start of the pull, and why the calculator computes both directions.

Factor e^(μ · φ) of a bend
Friction coefficient30°45°90°180°
0.101.051.081.171.37
0.151.081.131.271.60
0.251.141.221.482.19
0.351.201.321.733.00
0.501.301.482.194.81

Permissible pulling force with total conductor cross-section A in mm² and cable diameter D in mm:

Permissible pulling forces during installation (a cable manufacturer's installation notes)
Pulling methodCable typePermissible pulling force
Pulling eye on the conductorsall cablesA · 50 N/mm² (copper), A · 30 N/mm² (aluminium)
Pulling gripplastic-insulated cables without metal sheath and without armour (such as NYY, NAYY, N2XSY)as for the pulling eye
Pulling gripwire-armoured cables9 N/mm² · D²
Pulling gripcables with metal sheath without tension-resistant armour3 N/mm² · D² (single-sheath cable), 1 N/mm² · D² (three-sheath cable)
common pulling gripthree single-core cableslaid up three times, not laid up twice the value of a single cable

Friction coefficient – guide values from measurements by a lubricant manufacturer: duct with lubricant 0.09 to 0.11, duct without lubricant 0.22 to 0.35; as a conservative planning value 0.35 and above. For cable rollers the manufacturer's figure applies.

Example: 80 m straight – bend 90°, radius 2 m – 40 m straight; one cable 2.5 kg/m, 46 mm, 4 × 150 mm² aluminium, pulling grip, μ = 0.35
QuantityCalculationResult
In order: 80 m2.5 · 9.81 · 0.35 · 80687 N
Bend 90°687 · e^(0.35 · π ÷ 2) = 687 · 1.733; sidewall pressure 1190 ÷ 21190 N, 595 N/m
40 m1190 + 2.5 · 9.81 · 0.35 · 40 = 1190 + 3431533 N = 1.53 kN
Against the order: 40 m, bend, 80 m343 · 1.733 = 595; 595 + 687; sidewall pressure 595 ÷ 21282 N = 1.28 kN, 297 N/m
Permissible pulling force600 mm² · 30 N/mm²18.0 kN – 7 % utilised
Smallest bending radius15 · 46 mm0.69 m – the bend has 2 m

Pulled from the side with the bend, the pulling force is one sixth lower. With these inputs the calculator shows the same values.

Typical input errors:

  • Weight in kg/km: data sheets often state kg/km – divide by 1000 (2500 kg/km are 2.5 kg/m).
  • Cross-section of one conductor instead of all: for 4 × 150 mm², 600 mm² counts, not 150. Screen and concentric conductor are not included.
  • Radius in millimetres: the field expects metres (0.9 for a 900 mm bend).
  • Sign of the height difference: it applies in the order entered – uphill positive. The calculator reverses it for the opposite direction itself.
  • Many small changes of direction left out: flat bends count too; their angles add up in the exponent.
  • Friction coefficient too favourable: values around 0.1 only apply with lubricant along the whole length.

Something missing or unclear? Write to info@baustellen.tools.