Construction and civil works: set up, excavate, found

From the site layout plan through the excavation to the foundation: every location of your project carries its coordinate, its aerial image and its terrain – and every tool calculates with what the previous one produced.

For: Site management, work preparation and estimating in building and civil works

Start for free How it works

1 location free, no payment details. Runs in the browser – nothing to install. Try it without registering

Site layout on the aerial image: crane with working radius, container facility, storage areas and site road
Example from the sample project

The task

Space is finite

Crane, containers, storage, stockpiles and site roads need space – at different times. Whoever notices that only on site ends up rearranging.

Quantities before the tender

Excavation, slope area, backfill, concrete, formwork: the figures should be right before the excavator is ordered – and they should be verifiable.

Follow the rules without leafing

Slope angle, working space, trench width: the checklist puts your inputs next to the standard values and says where something needs checking.

How it works in the tool

  1. Create project and location

    When creating it, choose “Civil works” or “Building construction”; the location gets a coordinate – and with it aerial image, position and ground level.

    Location page with coordinate, ground level and the tools by work area
  2. Draw the site layout

    Areas, equipment from the equipment database and site roads on the aerial image, organised by construction phases; the check reports clashes of areas and dates.

    Construction sequence plan with access, storage areas and site fence on the aerial image
  3. Calculate the excavation

    Rectangle, free shape or four footings; slopes, berms, working space and the terrain slope suggested from the terrain model. Excavation and stockpiles are there immediately – and move into the sequence plan.

    Excavation pit simulation with inputs, key figures for excavation and stockpiles and plan view
  4. Add foundation and trench

    The foundation starts with the dimensions of the pit and gives concrete, formwork and backfill; the trench calculates width to EN 1610, excavation and pipe zone.

    Foundation with concrete, formwork, excavation, section through foundation and pit and checklist

The images show the application with sample projects – not real construction projects.

Results, rules and limits

What you get

  • Construction sequence plan as PDF with site plan per phase, legend, schedule and area demand; plus a CSV output
  • Excavation as PDF with plan, sections, quantities and check sheet to DIN 4124; 3D view as HTML, solid as STL
  • Foundation and trench as a sheet with inputs, sketch, checklist and quantities; tables to copy for Excel
  • Project as PDF, ZIP and KML; schedule across all locations, also for MS Project
  • Quantities across all locations: concrete, formwork, excavation

What calculations and checks are based on

  • DIN 4124 (excavations and trenches): slope angle per soil, working space, vertical walls, berms.
  • EN 1610: minimum trench width from nominal size and depth, bedding and cover.
  • Traffic management in the plan with objects to RSA 21.

Formulas, tables and sources in the manual

Limits

  • Results are planning aids. Stability verification, shoring design, dewatering and structural design remain with the specialist planners.
  • The standard values have been checked against documents that reproduce the standards – the current version is decisive.
  • Aerial image and ground levels are as current and accurate as the services that provide them.

Frequently asked questions

Do I need a separate plan for every construction phase?

No. One sequence plan per location carries all phases; every area has its dates, and the timeline shows the state on any day. The PDF outputs a site plan per phase.

Where does the terrain of the excavation come from?

As a suggestion from the terrain model at the location: the simulation fits a plane through the levels around the pit – without uploading. You can also enter the slope yourself.

Can several people work on the same project?

Yes. Projects have a team with roles; whoever edits a plan holds it for that time, others see it read-only meanwhile.

Try it on your next construction project.