- Basics
- 1Getting started
- 2Projects
- 3Locations
- Plans
- 4Site layout
- 5Escape and rescue plan
- Civil works
- 6Excavation pit simulation
- 7Foundation
- 8Trench
- Tower construction
- 9Tower assembly check
- 10Span (conductor)
- Cable construction
- 11Cable route and cable pulling
- 12Cable drum
- Team, subscription and account
- 13Working together
- 14Subscription
- 15Account
- Help
- 16Phone and tablet
- 17Keyboard shortcuts at a glance
- 18Frequently asked questions and messages
- 19What’s new
Basics
-
1 Getting started
How baustellen.tools is organised, how to create an account and what is included for free.
Project, location, tool · Trying it without registering · Creating an account · Logging in, account menu, logging out · Looking at and copying sample projects · Free and with a subscription · Five steps to your first plan
-
2 Projects
Create projects, enter locations, see everything at a glance and output it all together as PDF.
Project overview · New project · Project page · Cockpit: locations from left to right · Creating locations · Evaluation across all locations · Sorting locations · Archiving and restoring · Project reports · Schedule: construction phases of all locations · Schedule for Microsoft Project · Project as KML for Google Earth and GIS
-
3 Locations
The location page brings together the tools of one location. Only one person at a time works on a location.
Location page · Foundation and tower – step by step · Editing, moving, deleting · One location – one person · Linking tools
Plans
-
4 Site layout
The site layout plan over the construction period: areas, routes, crane radii and equipment with dates – checked for clashes, with quantities and a report.
Layout of the editor · Header and tool switcher · Drawing · Dimensions and measuring · Area and line types · Selecting, moving, rotating · Several objects, copy and paste · Tab Object · Equipment from the database · Stockpile · Construction phases and timeline · Surfacing and quantities · Tab Project: location, grid, georeference · Aerial image and own background image · Neighbouring locations and route · Excavation pit in the plan · Check · Saving, evaluation, PDF and CSV · Purpose, assumptions and limits · Calculation method, formulas and example · Keyboard shortcuts in the site layout tool
-
5 Escape and rescue plan
The notice to DIN ISO 23601 and ASR A1.3/A2.3: draw the floor plan, place escape routes and safety signs – for each viewing position a correctly oriented sheet is produced.
Layout · Walls and rooms · Containers · Doors, windows, stairs, lift · Escape routes, areas, safety signs · Viewing position “You are here” · Measuring · Floors, template and construction sequence plan · Title block, sheet and PDF · Checklist · Purpose, assumptions and limits · Keyboard shortcuts in the rescue plan
Civil works
-
6 Excavation pit simulation
Excavation with slopes, working space, berms and shoring for a rectangle, a freely drawn shape or the four footings of a pylon foundation – with stockpiles and a check against DIN 4124.
Overview · Shape and depth · Slope, working space and berms · Centre area, terrain, stockpiles, calculation · Shoring · Rotation to north, compass and aerial image · Views · Check against DIN 4124 · Output and transfer · Saving and resetting · Purpose, assumptions and limits · Calculation method, formulas and example · Keyboard shortcuts in the excavation pit
-
7 Foundation
A pad foundation of up to three steps – rectangular or round: concrete, formwork, blinding layer, excavation, backfill and surplus soil, also for several identical foundations.
Creating, calculating, saving · Inputs · Result · Purpose, assumptions and limits · Calculation method, formulas and example
-
8 Trench
A pipe trench from a few inputs: minimum width to EN 1610, excavation, pipe zone material, backfill and surplus soil – with a checklist.
Creating, calculating, saving · Inputs · Result · Purpose, assumptions and limits · Calculation method, formulas and example
Tower construction
-
9 Tower assembly check
Sections and cross-arms of a lattice tower: do dimensions, profiles and hole patterns at the joints match? With the shop drawings as PDF alongside and the tower in 3D on its foundation.
Creating, drawings, saving · Inputs · Tower foot, inclined foot and foundation · Result · Purpose, assumptions and limits · Method and example
-
10 Span (conductor)
A conductor in a span: sag, tension and conductor length in the initial state, at every conductor temperature and with ice load – as a sag table with the stringing sag for the day of installation.
Creating, calculating, saving · Inputs · Result · Purpose, assumptions and limits · Calculation method, formulas and example
Cable construction
-
11 Cable route and cable pulling
The pulling force when installing a cable: section by section over straights, gradients and bends, in both pulling directions – compared with the permissible pulling force of the cable.
Creating, calculating, saving · Route on the aerial image, joints and pulls · Inputs · Result · Purpose, assumptions and limits · Calculation method, formulas and example
-
12 Cable drum
How much cable fits on a drum, and which drum does a cable length need: layers, capacity, weight – with a checklist and a comparison of all drum sizes.
Creating, calculating, saving · Inputs · Result · Purpose, assumptions and limits · Calculation method, formulas and example
Team, subscription and account
-
13 Working together
Colleagues and subcontractors work in the team of a project – with all functions of the subscription, even with a free account.
Team of a project · Roles in the team · Accepting an invitation · Sharing individual plans
-
14 Subscription
A subscription belongs to your account: as many projects and as many locations as you need – you change both numbers yourself at any time.
How the subscription works · Subscribing · Subscribing while registering · Booking by invoice · Redeeming a voucher or discount code · Adding projects to the subscription and removing them · Changing the subscription · Invoices, payment, cancellation · Reminders by email · Letting colleagues share the subscription · Quota from the provider
-
15 Account
Teams, subscription and licences, email address, name, company and password – all on one page.
Account page · Email address, name, company, password · Language: German and English
Help
-
16 Phone and tablet
Every page adapts to the width of the screen; drawing is done with your fingers.
-
17 Keyboard shortcuts at a glance
What works the same in the three drawing tools – and where they differ. The complete lists are with the tools.
The most important keys · Keys on the pages · Help in the tool · On a Mac
-
18 Frequently asked questions and messages
What a message means and what you can do.
Logging in and account · While working · Subscription and invoice · Browsers and devices
-
19 What’s new
New tools, new features and improvements – the essentials in one sentence, with the date.
Nothing found. Try another word – “fence” instead of “fencing”, say – or look in the <a class="hdb-siehe" href="/en/manual/faq">frequently asked questions.
Something missing or unclear? Write to info@baustellen.tools.