Excavation in cubic metres
Total excavation, separated into topsoil and subsoil, in situ and loose. Plus the area at the top edge and the maximum depth.
Enter base, depth and slope angle – the excavation pit simulation immediately calculates the excavation volume, the top edge and the stockpiles and shows the pit in plan, in section and in 3D. As a rectangle, as a freely drawn shape or with four footings for a tower foundation.
Register for free Read more in the manual
1 location free, no payment details. Runs in the browser – nothing to install. Try it without registering

Total excavation, separated into topsoil and subsoil, in situ and loose. Plus the area at the top edge and the maximum depth.
Slope angle, berms at greater depth and the working space next to the structure. A check sheet compares the pit with the rules of DIN 4124 and states what is met and what still needs attention.
The simple pit from length and width, a freely drawn base with varying depths, or four footings of a tower foundation with a centre island – with shoring instead of slopes if required.
The excavated material becomes stockpiles for topsoil and subsoil: length, width, height and footprint. So you know in advance how much space the soil needs on site.
Click dimensions in the plan and change them directly. The section runs along a line that you place; the 3D view shows pit and terrain for rotating.
Pit and stockpiles move into the site layout plan of the same location with one click – in the correct position and with their dimensions.

Excavation pit 10 × 8 m, 3.00 m deep, working space 1.00 m, 45° slope. The figures are calculated by the same engine as in the application – when this page is opened.
| Quantity | Result | Calculation |
|---|---|---|
| Total excavation | 586.27 m³ | from the terrain grid, topsoil and subsoil together |
| of which topsoil | 81.3 m³ | stored separately |
| of which subsoil | 504.99 m³ | |
| Topsoil stockpile | 11.26 m long | with the default height and slope of the stockpile |
| Subsoil stockpile | 33.83 m long |
The same example calculation is in the manual with all intermediate steps.
No login, nothing saved: enter values, and the result is calculated by the same engine as in the application.
Rectangular pit in level terrain. In a project: free shape, terrain from the terrain model, berms, shoring, sections, 3D view, stockpiles with dimensions and the check sheet to DIN 4124.
What the tool does not do – so that it is clear what the result is good for. Results are planning aids, not construction documents.
From the base area, the depth and the slope: with every layer upwards the pit widens by the slope, plus berms and working space. With sloping terrain or varying depths the simple formula is no longer enough – the simulation therefore computes the volume on a fine grid over the whole pit.
The standard gives default angles depending on the soil – flatter for non-cohesive or soft cohesive soils, steeper for stiff cohesive soils and rock – and requires berms or a verification at greater depths. The simulation's check sheet compares your inputs with these rules. Which soil type is present is determined by the geotechnical report.
No. The results are planning aids for quantities, areas and sequence. Stability, shoring and dewatering remain the responsibility of the specialist engineers.
That depends on the loose (bulked) volume and the permissible height. The simulation gives one stockpile each for topsoil and subsoil with length, width, height and footprint.
With free access you see the shape of the excavation pit. Quantities, dimensions, sections, 3D view and the outputs are part of the subscription: €40 per project and €5 per location and month.
All tools work at the same location with the same coordinate – what is created in one is available in the next.