Skip to content

Excavation calculator: volume, slopes and stockpiles

Enter base, depth and slope angle – the excavation pit simulation immediately calculates the excavation volume, the top edge and the stockpiles and shows the pit in plan, in section and in 3D. As a rectangle, as a freely drawn shape or with four footings for a tower foundation.

Register for free Read more in the manual

1 location free, no payment details. Runs in the browser – nothing to install. Try it without registering

Excavation pit simulation: inputs on the left, key figures for excavation and stockpiles on the right, and the plan view of the pit with slopes

What the excavation pit simulation calculates

Excavation in cubic metres

Total excavation, separated into topsoil and subsoil, in situ and loose. Plus the area at the top edge and the maximum depth.

Slope, berm and working space

Slope angle, berms at greater depth and the working space next to the structure. A check sheet compares the pit with the rules of DIN 4124 and states what is met and what still needs attention.

Rectangle, free shape, tower foundation

The simple pit from length and width, a freely drawn base with varying depths, or four footings of a tower foundation with a centre island – with shoring instead of slopes if required.

Stockpiles with dimensions

The excavated material becomes stockpiles for topsoil and subsoil: length, width, height and footprint. So you know in advance how much space the soil needs on site.

Plan, section and 3D

Click dimensions in the plan and change them directly. The section runs along a line that you place; the 3D view shows pit and terrain for rotating.

Transfer into the site plan

Pit and stockpiles move into the site layout plan of the same location with one click – in the correct position and with their dimensions.

How to proceed

  1. Choose the shape. Rectangle, free shape or four footings; enter base dimensions and depth.
  2. Define the slope. Angle, berms, working space and – where needed – shoring. The key figures are recalculated with every change.
  3. Soil and stockpiles. Define topsoil and stockpiles; the stockpiles get their dimensions.
  4. Output. PDF report with plan, sections, quantities and the DIN 4124 check sheet, plus HTML with 3D view and STL.
3D view of an excavation pit with slopes, berms and terrain

An example, recalculated

Excavation pit 10 × 8 m, 3.00 m deep, working space 1.00 m, 45° slope. The figures are calculated by the same engine as in the application – when this page is opened.

Bottom
10 × 8 m
Depth
3.00 m
Working space
1.00 m
Slope angle
45°
QuantityResultCalculation
Total excavation586.27 m³from the terrain grid, topsoil and subsoil together
of which topsoil81.3 m³stored separately
of which subsoil504.99 m³
Topsoil stockpile11.26 m longwith the default height and slope of the stockpile
Subsoil stockpile33.83 m long

The same example calculation is in the manual with all intermediate steps.

Estimate an excavation pit

No login, nothing saved: enter values, and the result is calculated by the same engine as in the application.

Total excavation
586.3 m³ topsoil 81.3 m³ · subsoil 505.0 m³
Area at the top edge
280.4 m²
Greatest depth
3.00 m
Subsoil stockpile
33.8 m long with the default height and slope

Rectangular pit in level terrain. In a project: free shape, terrain from the terrain model, berms, shoring, sections, 3D view, stockpiles with dimensions and the check sheet to DIN 4124.

Save in a project – with PDF, 3D and team

Limits

What the tool does not do – so that it is clear what the result is good for. Results are planning aids, not construction documents.

  • The simulation is a preliminary design: it replaces neither the stability verification nor the ground investigation.
  • The checklist checks slope angle and working space against the standard values of DIN 4124; dewatering, shoring design and loads at the slope edge are not calculated.
  • The length of the stockpiles is an approximation using a frustum.

Frequently asked questions

How do you calculate the excavation volume of a pit?

From the base area, the depth and the slope: with every layer upwards the pit widens by the slope, plus berms and working space. With sloping terrain or varying depths the simple formula is no longer enough – the simulation therefore computes the volume on a fine grid over the whole pit.

Which slope angle applies under DIN 4124?

The standard gives default angles depending on the soil – flatter for non-cohesive or soft cohesive soils, steeper for stiff cohesive soils and rock – and requires berms or a verification at greater depths. The simulation's check sheet compares your inputs with these rules. Which soil type is present is determined by the geotechnical report.

Does the calculation replace the stability analysis?

No. The results are planning aids for quantities, areas and sequence. Stability, shoring and dewatering remain the responsibility of the specialist engineers.

How big will the stockpile be?

That depends on the loose (bulked) volume and the permissible height. The simulation gives one stockpile each for topsoil and subsoil with length, width, height and footprint.

What is free?

With free access you see the shape of the excavation pit. Quantities, dimensions, sections, 3D view and the outputs are part of the subscription: €40 per project and €5 per location and month.

Try it on your next construction project.

One location free, all tools. No credit card, no subscription.

Register for free