Contents
- Basics
- 1Getting started
- 2Projects
- 3Locations
- Plans
-
4Site layout
- Layout of the editor
- Header and tool switcher
- Drawing
- Dimensions and measuring
- Area and line types
- Selecting, moving, rotating
- Several objects, copy and paste
- Tab Object
- Equipment from the database
- Stockpile
- Construction phases and timeline
- Surfacing and quantities
- Tab Project: location, grid, georeference
- Aerial image and own background image
- Neighbouring locations and route
- Excavation pit in the plan
- Check
- Saving, evaluation, PDF and CSV
- Purpose, assumptions and limits
- Calculation method, formulas and example
- Keyboard shortcuts in the site layout tool
- 5Escape and rescue plan
- Civil works
- 6Excavation pit simulation
- 7Foundation
- 8Trench
- Tower construction
- 9Tower assembly check
- 10Span (conductor)
- Cable construction
- 11Cable route and cable pulling
- 12Cable drum
- Team, subscription and account
- 13Working together
- 14Subscription
- 15Account
- Help
- 16Phone and tablet
- 17Keyboard shortcuts at a glance
- 18Frequently asked questions and messages
- 19What’s new
4 Site layout
The site layout plan over the construction period: areas, routes, crane radii and equipment with dates – checked for clashes, with quantities and a report.
Layout of the editor
The editor is opened with Draw in the location list or on the location page. It fills the whole window:
- Place: project and location – both lead back; the logo at the far left leads to the projects.
- Tool switcher: construction sequence, excavation pit and rescue plan of this location.
- Save status: “saved” or “unsaved changes”.
- Buttons: Undo, Redo, Check, Save, PDF, CSV and Evaluation.
- Tools: drawing – Select, Rectangle, Polygon, Line, Radius, Equipment, Stockpile; view – Grid, Time, All, Names, Measure.
- Plan: the site plan with aerial image, north arrow and source note.
- Tabs: Object, List (with the number of objects), Sections, Project, Check (with the number of findings).
- Properties of the selected object – here a site road.
- Timeline: construction phases as coloured bands; the slider selects a day.
- Footer: day and occupied area, coordinates under the mouse (plan and UTM), grid, scale.
- Help: “?” or the key ? shows all mouse, touch and keyboard commands.
Header and tool switcher
Site layout, excavation pit and rescue plan share the same header:
- At the left the logo (leads to the projects), with the project above and the location below – both lead back.
- Next to it the tool switcher: the three tools of the location as tabs in their colours. A click switches; if the tool does not exist at the location yet, the page asks and creates it (“Create and open”).
- The save status: “saved” or “unsaved changes”.
- At the right Undo, Redo, Check, Save and the outputs PDF Subscription, CSV Subscription and Evaluation.
Drawing
| Tool | Key | How it works |
|---|---|---|
| Select | V | click selects, drag moves |
| Rectangle | R | drag it open with the mouse button held down |
| Polygon | P | click the corners; double-click or Enter closes it |
| Line | S | site fence, barrier, service line, access route: click the points, double-click or Enter finishes |
| Radius | K | a circular area, such as a crane radius: press at the centre and drag the edge – or click the centre, type the radius, Enter |
| Equipment | M | choose from the database and place – Equipment |
| Stockpile | B | size it from volume and dumping height – Stockpile |
At the bottom right of the plan there is a scale bar. Larger and Smaller in the bar on the left zoom around the centre of the plan – like the mouse wheel or two fingers. If an aerial image lies below the plan, the grid recedes; snapping works as usual.
- While drawing, the mouse shows the length of the current piece and the total length or area, for a radius the radius and area; a small circle shows where the next point will snap to.
- Everything snaps to the grid and to the corners of existing objects. G or Grid toggles display and snapping. You choose the grid size in the footer (0.5 to 50 m) or in the tab Project › Location (0.1 to 100 m); when zoomed out, the plan shows only every 2nd, 5th, 10th … line (“Lines every 5 m”).
- View: the mouse wheel zooms, the middle mouse button or Space + drag pans – without dragging, use the four arrow buttons on the left under “View” –, Home or All shows the whole plan, F fits the view to the selection (as does a double-click in the list).
- Names N hides and shows the labels; the selected object always shows its name.
- Esc cancels drawing in progress and switches back to Select. New objects land in the construction phase of the day selected in the timeline.
Dimensions and measuring
- The selected object shows its edge lengths outside along the edges, a circle its radius.
- For rectangles (rotated ones too), the tab Object has Length and Width under “Position and rotation” for typing in – the centre stays put.
- Measure A measures chains: click the points; each piece shows its length, the end shows the total; for a single piece also direction and Δx/Δy. Double-click or Enter finishes, Esc clears. Measurements are not saved.
Area and line types
The type determines colour, label and whether an object counts towards the area balance. It is chosen in the tab Object.
Areas
- Stockpile
- Container
- Skip / waste disposal
- Equipment standing area
- Crane pad
- Storage area
- Working area
- Restricted area
- Loading zone
- Anchoring
Lines
- Barrier chain / railing
- site fence
- Cable / utility line
- Access route
- Traffic routing
With their own tool
- Crane radius (tool Radius)
- Equipment from the database
Lines have a corridor width (important for access routes and site roads), circular areas a radius. A circular area is a full area with a selectable type, surfacing, balance and check; crane radii are filled more lightly and lie beneath the other areas.
Own types: at the very bottom of “Type” there is Create own area type … (for lines Create own line type …). Enter name and colour – eight suggestions or any other colour – and the sample shows how the type looks in the plan.
- The type applies to all locations of the project and then appears in the group “Own types”; it shows up in legend, tables, area balance, CSV and PDF like the built-in ones.
- When an own type is selected, Change type (all objects take over name and colour) and Remove type appear below – removal works when no other object uses it.
- At most 30 own types per project.
Selecting, moving, rotating
- Clicking selects, dragging moves. The small squares at the corners move individual points, for circular areas the radius.
- The arrow keys nudge the selection by one grid step, with Shift by five.
- Rotating: drag the round handle above the object – in 15° steps; if an edge of a neighbour or of the excavation pit is nearby, the rotation snaps parallel or at right angles to it (the edge lights up orange). With Shift to the degree. Q and E rotate by 90°, with Shift by 15° – including equipment still attached to the mouse.
- Delete with Del, duplicate with CtrlD, undo with CtrlZ, redo with CtrlY.
- A piece of equipment takes its working radius along when it is moved, rotated or deleted.
- Labels show the name in the plan. If it does not fit into the area, it is shortened or moves just beside it – further away with a fine line to the object; the selected object always shows the full name. Numbers appear in the list and in the PDF.
Several objects, copy and paste
- Shift-click or Ctrl-click adds to or removes from the selection, CtrlA selects everything currently visible.
- Drag a frame on empty space: dragged to the right it selects what lies entirely inside, to the left everything it touches.
- The group moves together; the round handle above the frame rotates it, and Q/E, Del, CtrlD and the arrow keys act on all of them. The tab Object shows the list with totals and assigns a construction phase to all at once.
- Copy CtrlC, cut CtrlX, paste at the mouse CtrlV, in the same place CtrlShiftV.
- Via the clipboard this also works into another plan in a second window. If both plans are georeferenced, objects pasted “in the same place” land at exactly the same spot there; construction phases are matched by name, and own types and plate types come along.
- If the browser does not allow clipboard access, the tab Object shows the button Paste copied objects.
The tab List holds all objects with number and type; the field “Filter objects …” searches by name, a click selects, Shift-click adds to the selection, a double-click brings the object into view.
Tab Object
At the top is the header: colour of the type and name, below it Copy, Duplicate and Delete. It stays in place when you scroll. Below it the key figures (area, perimeter, dimensions, period) and the fields:
- Name, Type, for circular areas Radius, for lines Corridor width, Equipment (free text).
- Period: construction phase – or “Own dates” with from and to.
- Position and rotation: orientation in degrees or ↺/↻ by 90° and 15°; for rectangles length and width.
- Surfacing and quantities – Surfacing and quantities.
- Display and check: position of the label, “In the area balance”, “Overlap permitted”.
- Remark and Points: the coordinates as a table for precise typing.
Collapsed sections show at the right what is set; the browser remembers which ones are open.
Equipment from the database
M or Equipment opens the equipment database: 632 items with top view, dimensions and key data.
- Search by manufacturer, model, type or key value; several words narrow it down (“liebherr ltm 1050”). Enter selects the first hit, ↓ jumps into the grid, where the arrow keys move.
- Equipment type to click, each with its number of hits; “Recently used” shows your latest items. Manufacturer, Sort (type, name, length, weight, working radius, working height).
- Size small · medium · large – compared within the equipment type. Measurements: length, width, height and weight up to, working radius and working height from. “Reset filters” at the top right.
- A click selects an item: at the right Position (working position with outriggers extended, or transport), Working space all round (default 0.5 m), Rotation, Load to be lifted – baustellen.tools then calculates the permissible outreach from the load curve and draws the working radius accordingly – and the tick box for drawing the working radius as a circle. For ballast sleds, the number of concrete blocks.
- Double-click, Enter twice or Place in the plan: the item is attached to the mouse, a click places it.
Equipment types in the database
- Forklift 145
- Excavator 78
- Telehandler 60
- Aerial work platform 58
- Mobile crane 56
- Site layout 50
- Cable pulling machine 45
- Traffic management 43
- Wheel loader 23
- Drilling rig 18
- Wheeled excavator 15
- Crawler crane 12
- Ready-mix concrete 11
- Earthmoving 9
- Transport 7
- Anchoring 2
Traffic management contains German traffic signs to StVO and RSA 21 (warning, regulatory and supplementary signs, delineator beacons, barriers, temporary traffic lights). In the plan and in the PDF they appear at a fixed, legible size as in a traffic sign plan and are not rotated along; the short name (“VZ 274-30”) is the label.
Stockpile
- B or Stockpile: enter the volume (loose, m³), the maximum dumping height (default 2 m), the slope 1 : n and, if you wish, the base width, then Calculate – baustellen.tools sizes the footprint and states dimensions and utilisation.
- Place in the plan, then click.
- The stockpiles of an excavation pit arrive ready-made with the transfer from the excavation pit simulation. Excavation pit in the plan
Construction phases and timeline
In the tab Sections you create the construction phases: + Construction phase, then name, start, end, colour, description and “Excavation pit open in this phase”. The list states duration and number of objects for each phase. Delete phase removes it; its objects remain.
Every object follows the period of its phase – unless it has its own dates.
The timeline at the bottom shows the phases as coloured bands. With the slider you select a day; next to it are the date, the phase and the area occupied on that day. T or Time hides everything that is not on site on that day.
Surfacing and quantities
Every area and line can be given a surfacing in the tab Object under Surfacing and quantities. The quantity appears immediately below – number of pieces, orientation, overlap and the covered share of the area.
- Layout automatic (the most economical), crosswise or lengthwise. Lines are calculated per segment, driving curves per straight and bend.
- No plate protrudes beyond the drawn area: whole plates lie flush in rows, and free edges and corners are closed by rotated additional plates – small gussets remain free. Below 95 % coverage a note appears.
- “Calculating the layout …”: the laying plan is calculated by the server, while dragging only after you let go.
| Surfacing | Size | calculated as |
|---|---|---|
| Steel plates | 6.00 × 1.80 m | pieces from the laying plan, 10 cm overlap at the joint |
| ISOTRACK-X | 3.80 × 1.80 m | pieces from the laying plan, butt-jointed |
| Excavator mats | 5.00 × 1.00 m | pieces from the laying plan, butt-jointed |
| Gravel | layer thickness in cm | m³ and t (conversion in the tab Project, default 1.8 t per m³) |
| Own plate type | 0.3 to 30 m | pieces from the laying plan, overlap as defined |
Own plate types: at the very bottom of “Surfacing” there is Create own plate type … – plate name, length and width in metres, overlap yes/no and, if yes, the share in per cent of the plate edge (4 × 2 m with 5 % gives 20 cm at the short sides and 10 cm at the long sides).
- The type applies to all locations of the project (group “Own plate types”, own colour in plan and legend).
- Change plate type re-lays all objects with the type; Remove plate type works when no other object and no other location uses it any more. At most 30 per project.
- The laying plan is shown schematically in the plan; in the PDF, covered areas appear only as laid plates, and the legend names the surfacings.
- The evaluation shows the quantities per surfacing and per object; “Quantities as CSV” Subscription. The PDF report has a page “Quantity take-off” with the plate demand over the construction period; the project overview summarises all locations.
Driving curves on access routes: for an access route with a corridor width you choose a curve radius of 8 to 16 m in the tab Object – each entry names two vehicles that need roughly this radius. Every corner becomes a bend, the vehicle travels along the path, and the corridor widens in the curve (plus 0.5 m safety margin on each side). The plates follow the centre line as a fan. If there is not enough room, the plan reports that the curve is too tight, with the radius needed and the radius possible.
Tab Project: location, grid, georeference
The tab Project applies to the whole plan. It has four collapsible sections – location, excavation pit, aerial image and own background image; when collapsed, each states its status.
- Location: name, place, editor and remark – they appear in the header of the PDF.
- Grid from 0.1 to 100 m as a number, plus the usual steps to click; ↑/↓ in the field jump through the steps.
- Georeference: the origin (0/0) of the plan is the coordinate of the location in ETRS89 / UTM 32 – read-only here; it is changed on the location page. Rotation against north rotates the plan relative to north.
- Quantity take-off: conversion for gravel, in t per m³ or m³ per t (default 1.8 t per m³).
Aerial image and own background image
Load the aerial image continuously while drawing (checkbox in the section Aerial image, ticked by default): if the location has a coordinate, the orthophoto lies beneath the plan by itself and reloads when you pan and zoom – up to 6 km around the location. Your work never waits for an image: what is still missing appears coarse first, then sharp. This background applies to the drawing area and is not saved with the plan.
Load aerial image fetches the orthophoto from the service of the German federal state (open data) as one fixed image and places it beneath the plan – this image also appears in PDF and other outputs. Save afterwards.
- Map service: automatic by position, a particular state, or your own WMS service (address, layer, source note).
- Surrounding radius 5 to 2500 m, with steps to click. It applies around the plan (everything drawn) or around the location (a square around the origin).
- Resolution 0.05 to 2 m per pixel (default 0.2). baustellen.tools loads large extents uniformly coarser, at most 2400 pixels per edge – the note below tells you beforehand.
- A dashed frame in the plan shows what will be loaded; “Show in the plan” brings it into view.
- The source note appears at the bottom left of the plan and in the PDF. At state borders, baustellen.tools joins the images of several states.
Own background image (PNG, JPEG, TIFF), such as a site plan or a drone photo: with a world file (.pgw, .jgw, .tfw) or as a GeoTIFF it sits correctly by itself; otherwise enter the corner coordinates (east left, north bottom, east right, north top) and Apply frame. Plus opacity, “Show image” and source note.
Neighbouring locations and route
Each location has its own plan. An object belongs to the location in whose plan it is drawn – whatever you draw always ends up in the location that is open.
- Neighbours in the plan: if the locations of a project have coordinates, the plan shows the other locations within 2 km: a marker with name and distance and – faded and dashed – the objects of their construction sequence plans, in the correct position. This shows you what is already occupied next door.
- Not editable: objects of a neighbouring location cannot be selected, moved or deleted here. A click on one (or on the marker) asks: “The object belongs to the location … Do you want to save your current state and switch to location …?” – Save and switch saves the plan and opens the neighbour's.
- Route: if a neighbour is closer than 500 m, the editor creates the line Route once when the plan is opened, from the origin (the location) up to halfway. That is where the location ends – a dashed boundary line shows it. The other half is created in the neighbour's plan. The route is an ordinary line: type, width, surface, dates and course can be changed. It is part of the plan only after Save.
- Once per neighbour: if you delete or redraw the route, it does not come back unasked. Create routes to the neighbours again (tab Project › Neighbouring locations) creates them again; unchanged, automatically created ones are replaced.
- Tab Project › Neighbouring locations: the list of neighbours with distance – a click switches to their plan – and the checkbox that hides neighbours and their objects.
Excavation pit in the plan
- Easiest from the excavation pit simulation: To sequence plan Subscription in the header of the excavation pit writes top edge and base into the plan of the same location and places the stockpiles next to it. How it works
- Or upload an STL file in the tab Project › Excavation pit (scale factor 0.001 for millimetres, “Detect ground level automatically”) and Take over excavation pit from STL. Ground level, outline, base, depth and excavation volume are detected.
- Δx, Δy and rotation with Apply move the pit, Remove takes it out.
- If the excavation pit is open in a phase (tab Sections), the check reports every area that protrudes into it.
Check
- Check calculates clashes in space and time as well as areas that protrude into an open excavation pit. The tab Check shows the number in red or a green tick.
- Each finding names both objects, the period and the area; a click jumps to the object in the plan.
- Below it the area demand over the construction period with its peak.
- If two objects may lie on top of each other (crane over storage area), set “Overlap permitted” on the object. Whatever should not count towards the area balance loses the tick “In the area balance”.
Saving, evaluation, PDF and CSV
- Save with CtrlS or the button; the header shows “saved” or “unsaved changes”.
- PDF Subscription: the report of the location with site plan, phase pages, schedule, area demand, equipment and quantities. CSV Subscription: the area list for Excel.
- Evaluation opens the page with all key figures of the plan.
On the evaluation: Open in the editor, the menu Output Subscription with Report as PDF (phase pages show a detail around the occupied areas, with an overview map), PDF, phases in the overall plan and Area list as CSV, plus the sampling point (every 1, 7, 14 or 28 days) for check and demand curve. Below that clashes, area demand over the construction period, quantity take-off (also per object) and the schedule as a bar chart.
Purpose, assumptions and limits
- Purpose
- Plan the site layout in its true position and carry it through the construction period: who needs which area when, where cranes and equipment stand, where something clashes – and which quantities of plates and gravel are needed.
- Typical use
- Site layout plan for tender and work preparation; crane positions with slewing range; access routes with driving curves; storage and assembly areas per construction phase; quantities for site roads and hardstandings; pylon sites in power line construction.
- For whom
- Site management, work preparation, foremen, estimating, health and safety coordination.
- Units
- Position in m in the plan – the origin is the coordinate of the location (ETRS89 / UTM 32); lengths, widths and radii in m; areas in m²; layer thickness in cm; gravel in m³ and t; loads in t; rotation in degrees; dates as calendar dates, first and last day included.
- Assumptions
-
- The plan is a flat top view. It knows no heights, gradients or slopes.
- An object occupies its whole drawn area on every day of its period. A line occupies length × corridor width.
- Equipment stands in the plan with the dimensions from the equipment database in the chosen position (outriggers extended or transport), plus the working space all round.
- Gravel: placed volume = area × layer thickness; the conversion to tonnes is one fixed value for the whole plan (default 1.8 t per m³).
- Plates lie as whole plates within the drawn area; nothing is cut.
- Technical limits
-
- No heights: the plan does not check whether a jib slews over a building, an overhead line or a second crane.
- The load capacity is an approximation: the curve in the equipment database has few points and does not apply to every configuration. For the actual lift, only the manufacturer’s load charts for boom, ballast, outrigger base and wind count – and the lift planning of the crane operator.
- No ground conditions: bearing capacity of set-up and driving areas, outrigger pressures and distances to slopes and excavation pits have to be verified separately.
- Driving curves are an approximation from curve radius and vehicle width with 0.5 m safety margin on each side; they do not replace a swept-path analysis for a particular vehicle.
- Aerial images show the state at the time of the survey flight and have the positional accuracy of the state service. The plan is not an official site plan and not a survey result.
- Traffic signs appear in the plan as symbols; this is not a traffic sign plan ordered by the road traffic authority.
- The check only sees what is drawn. It finds service lines, protection strips, trees or neighbouring boundaries only if they are in the plan as objects.
- Regulations
- The traffic signs of the equipment database follow the German StVO and RSA 21. The site layout itself is governed in Germany by the Construction Site Ordinance (Baustellenverordnung), the workplace rules (ASR) and the client’s requirements – the plan helps to show them but does not check them. Outside Germany, the local rules apply.
- Data protection
- What is stored is the plan with its objects, names and remarks, and the details in the tab Project (place, editor) – they appear in the header of the PDF. Aerial images are fetched by the server from the map service; the service learns the map extent, not your network address. The same applies to your own WMS service. An unsaved draft exists only in your browser on this device. More in the privacy policy (German).
Calculation method, formulas and example
Areas: polygons from their corner coordinates, circular areas as π · r², lines as length × corridor width. The key figures in the tab Object and the area list use these.
Clashes: two objects are reported when their periods overlap – one common day is enough – and their areas overlap, unless “Overlap permitted” is set on one of them. The finding states the common period and the overlapping area. If the excavation pit is open in a phase, every area that protrudes into its top edge is added; restricted areas and lines may lie along the edge.
Area demand over the construction period: at every sampling point – every 7 days from the first day, plus the last day; on the evaluation also 1, 14 or 28 days – the plan adds up the areas of all objects that are active on that day and carry “In the area balance”. The peak is the largest of these values.
Gravel: V = A · d m = V · ρ (d layer thickness in m, ρ conversion in t per m³)
Plates: the number of pieces comes from the laying plan, not from area ÷ plate area. The covered share is the laid area in relation to the drawn area.
Stockpile with a rectangular base b × l, height h and slope 1 : n on all sides:
V = h · (b · l − n · h · (b + l) + 4 ÷ 3 · n² · h²)
Without a base width the planner sizes the stockpile as a square – the smallest footprint – and with a base width it solves the formula for the length. The plateau measures (b − 2nh) × (l − 2nh); the utilisation is V ÷ (b · l · h). If the volume is not enough for the full height, or the base width is narrower than 2nh, the stockpile becomes lower; a note says so.
Load capacity and outreach: between two points of the load curve (r1, Q1) and (r2, Q2) the planner interpolates linearly; the permissible outreach for a load is the largest radius at which the curve has not yet fallen below the load.
Q(r) = Q1 + (Q2 − Q1) · (r − r1) ÷ (r2 − r1)
| Task | Calculation | Result |
|---|---|---|
| Site road 120 m long, corridor 4 m, gravel 30 cm | A = 120 · 4 = 480 m²; V = 480 · 0.30; m = 144 · 1.8 | 144 m³, 259.2 t |
| Stockpile 1200 m³ loose, height 2 m, slope 1 : 1, no base width | side = 1 · 2 + √(1200 ÷ 2 − 2² ÷ 3) | 26.47 × 26.47 m = 701 m², plateau 22.47 m, utilisation 86 % |
| the same stockpile with a base width of 20 m | l = (1200 ÷ 2 + 2 · 20 − 4 ÷ 3 · 2²) ÷ (20 − 2) | 20 × 35.26 m = 705 m², plateau 16 × 31.26 m |
Typical input errors:
- Coordinate of the location missing or swapped: the aerial image then lies in the wrong place or cannot be loaded. Check easting and northing on the location page.
- Line without corridor width: it has no area and gets no surfacing – the quantities show “Corridor width missing”.
- Layer thickness in metres or empty: the field expects centimetres; without a value it says “layer thickness missing” and the quantity stays zero.
- Slewing range drawn as an ordinary area: created with the tool Radius, a crane radius does not count towards the area balance and may overlap other objects. Drawn as a rectangle or polygon, the check reports every area beneath it and the area demand is too high – then untick “In the area balance” and set “Overlap permitted”.
- Bank instead of loose volume for the stockpile: the dialog expects loosened soil; multiply bank volume by the bulking factor first.
- Load without lifting gear: under “Load to be lifted”, include hook block, spreader beam and slings.
- Sampling too coarse: with 28 days, a short peak between two sampling points may be missed. For checking tight construction stages choose 1 or 7 days.
- Object in the wrong phase: new objects land in the phase of the day selected in the timeline – set the slider before drawing or change the phase in the tab Object.
Keyboard shortcuts in the site layout tool
| Key or mouse | Effect |
|---|---|
| V R P S K M B | Select, Rectangle, Polygon, Line, Radius, Equipment, Stockpile |
| A | Measure |
| Enter · double-click | close polygon, finish line or measurement; apply typed radius |
| Esc | cancel drawing, dragging or measuring; clear selection |
| Q / E | rotate by 90° anticlockwise or clockwise |
| ShiftQ / ShiftE | rotate by 15° |
| ← ↑ → ↓ | nudge the selection by one grid step, with Shift by five |
| Del · Backspace | delete selection |
| CtrlD | duplicate |
| CtrlC CtrlX CtrlV | copy, cut, paste at the mouse |
| CtrlShiftV | paste in the same place |
| CtrlA | select everything visible |
| CtrlZ / CtrlY | undo, redo |
| CtrlS | save |
| G T N | grid, time filter, names on/off |
| F · Home | fit to selection · show everything |
| ? | overview of all mouse, touch and keyboard commands |
| Mouse wheel | zoom |
| Space + drag · middle mouse button | pan the view |
| Drag on empty space | selection frame: to the right entirely inside, to the left touched |
| Shift + click | add to or remove from the selection |
| round handle | rotate, with Shift to the degree |
Nothing found. Try another word – “fence” instead of “fencing”, say – or look in the <a class="hdb-siehe" href="/en/manual/faq">frequently asked questions.
Something missing or unclear? Write to info@baustellen.tools.