6 Excavation pit simulation

Excavation with slopes, working space, berms and shoring for a rectangle, a freely drawn shape or the four footings of a pylon foundation – with stockpiles and a check against DIN 4124.

Overview

Excavation pit simulation with inputs at the left, key figures at the top and the plan view over the aerial image
At the left the inputs, at the right the key figures and the plan view with compass ring – here over the aerial image.

If the excavation pit belongs to a location, the step bar of the foundation appears below the header: excavation pit → foundation → tower base → tower parts, with the state of every step and the way to the next – the same bar as in the foundation tool and in “Tower assembly check”.

  • Open in the location list or on the location page. The header is the same as in the site layout tool – project, location, tool switcher, save status – with Undo, Redo, Save, ?, To sequence plan and the menu Output at the right. Header and tool switcher
  • Every change is calculated exactly straight away; the status is shown at the top of the input column (“Calculated · grid 0.10 m”).
  • At the left the inputs in collapsible sections; they stay in place when you scroll and have their own scroll bar. When collapsed, each section shows what is set; “Explanation” opens longer notes.
  • At the right the tiles Subscription: total excavation with top edge and maximum depth, topsoil, subsoil, highest slope, the dimensions of both stockpiles – and the difference from the saved state.
  • Below them the views Plan, Section, 3D, Sensitivity, Dimensions and Stockpiles – also with the keys 1 to 6. Views
  • The page stores unsaved changes in the browser every four seconds; after a crash it asks the next time you open it whether to restore the unsaved state.
Six tiles: total excavation, topsoil, subsoil, highest slope, topsoil stockpile and subsoil stockpile
The tiles: quantities and stockpiles at a glance, with the comparison to the saved state below.

Shape and depth

Under Shape of the excavation pit there are three shapes:

Rectangle
Basement, shaft, slab foundation: length Lx and width Ly of the structure, foundation depth. Without rotation, Lx runs west–east.
Free shape
L-, U- or T-shaped plans, oblique boundaries, pits with a pump sump: a polygon that you draw.
4 footings
Pylon foundation: four footings Lx × Ly arranged radially around the pylon centre, without rotation E1 in the north, E2 in the east, E3 in the south, E4 in the west – each footing with its own distance and its own foundation depth.
Excavation pit with the shape 4 footings: at the left the footing table with distance and foundation depth, at the right the plan view with the four footings around the pylon centre
Shape “4 footings”: at the left distance and foundation depth per footing, at the right the footings E1 to E4 around the pylon centre.

The table below the shape lists position, distance, foundation depth and excavation for each pit, area or footing. For footings, “Distance all” and “Depth all” set all of them at once. Base or footing position: horizontal (level at the foundation depth) or parallel to ground level (the depth below ground stays the same everywhere).

Free shape with a table of corners, angles and edge lengths
Free shape: interior angle and edge length per corner; one edge “closes” the polygon.

Drawing a free shape:

  • Redraw, then click the corners one after another – or freehand: hold the mouse button down and trace the outline, which becomes corners. The direction snaps in 15° steps to the previous edge, lengths to 10 cm.
  • Close with a click on the first corner, a double-click, Enter or Close shape. Backspace or Remove last corner takes back the last corner, Esc cancels.
  • Adjusting in the table: per corner the interior angle and the following edge. One edge closes the polygon – its length and the angles at its ends follow from the rest (grey); you choose which one in the column “closes”. “+” puts a corner in the middle of the edge, “×” removes one.
  • In the plan view, drag corners (grid 5 cm, with Shift 1 cm) and click any length or angle to change it.
  • Several areas (up to 12), each with its own foundation depth: + Area draws another; F1, F2 … select the area for table and buttons. Where areas overlap, the deeper one wins – so a pump sump sits correctly in its basement.
  • Start again as a rectangle replaces the selected area by its bounding rectangle, Delete area removes it.

Slope, working space and berms

  • Soil according to DIN 4124 limits the slope angle without a stability analysis: non-cohesive or soft cohesive up to 45°, at least stiff cohesive up to 60°, rock up to 80°; “with stability analysis” releases it. The slider only goes as far as the limit.
  • Slope angle and Working space per side (default 1 m; according to DIN 4124 at least 0.50 m, with shoring 0.60 m).
  • Berms “automatic”: every slope higher than the step height (default 3 m) is divided into sections of equal height, with a horizontal berm of the berm width (default 1.50 m) between them. “none” switches them off.
  • For footings: “Connecting areas between the footings”.

Centre area, terrain, stockpiles, calculation

Centre area
footings only: “Excavate centre island” gives a continuous base between the footings, at most with the gradient set; plus the slope of the centre area.
Terrain and soil
Gradient west → east and south → north (for footings E4 → E2 and E3 → E1) in per cent, topsoil in cm. Suggest slope from the terrain model enters both gradients from the official elevation model (grid width 1 m; best-fit plane through the levels around the pit) and states the level at the location and how well the plane fits. Available throughout Germany for locations with coordinates: the website fetches the levels from the state's raster service (North Rhine-Westphalia, Hesse, Brandenburg, Mecklenburg-Western Pomerania, Lower Saxony), for the other states from the open terrain tiles of Mapterhorn, which are computed from the terrain models of all 16 states, and caches them. The elevation model shows the ground at the time of the survey flight, without vegetation and buildings – it does not know later fills and trenches. The suggestion does not replace a site survey.
Stockpiles
Bulking of topsoil and subsoil, base width and height of both stockpiles, distance between them.
Calculation and arrangement
Grid spacing (default 0.1 m), margin around the pit; for footings the alignment radial or fixed with a rotation.

Shoring

Shoring holds the ground vertically: within the shoring area the ground level remains, and at its edge there is a wall instead of the slope.

  • On base edge: click an edge of the base in the plan view (it lights up orange). The shoring stands on this edge and covers the slope behind it; two adjacent sides close tightly at the corner. Click further edges; Esc finishes.
  • Draw freely: click corners – they snap to corners and edges of base, top edge, structure, berms and other shoring. Alt draws without snapping, Shift in 15° steps. A click on the first corner, a double-click, Enter or Finish shoring closes; Backspace takes back the last corner.
  • Changing: drag corners; the handle on an edge inserts a corner, a double-click on a corner deletes it, the round centre handle moves the area, “×” in the list deletes it.
  • Above the drawing there is a table per shoring Subscription: wall length, wall area, maximum and mean height, perimeter and footprint.

Rotation to north, compass and aerial image

  • In the plan view a compass ring lies around the excavation pit; north is always up. Dragging the ring or its handle rotates the whole pit including shoring about its centre – in 1° steps, with Shift in 15° steps. You can click the angle next to it and type it in; it is also in the field Rotation to north (clockwise, as on a compass).
  • If the location has a coordinate, the tick box Aerial image places the orthophoto beneath the plan view. That way you align the pit with roads and buildings or draw a free shape directly on top. The small red circle is the coordinate of the location.
  • Further tick boxes: depth in colour, contour lines, section line, dimensions, compass. Show everything fits the drawing; the mouse wheel zooms, dragging on empty space pans.
  • Numbers in the drawing can be clicked and changed: type the value, Enter; Esc cancels. Dragging footings changes their distance from the pylon centre.

Views

All views except the plan view Subscription.

3D view of the excavation pit with contour lines
3D: drag rotates, wheel zooms.
Section west to east through the excavation pit
Section with vertical exaggeration “auto”.
Section
West → east, south → north (for footings E4 → E2, E3 → E1) or “free” – then drag the two handles of the section line in the plan view. Vertical exaggeration auto, 1 : 1 or 2 : 1.
3D
Dragging rotates, the right mouse button or Shift + drag pans, the wheel zooms; on the keyboard the arrow keys rotate, +/- zoom, 0 resets. Without dragging, use the arrow buttons above the view: choose Rotate or Move, then ← ↑ ↓ →; − and + zoom. Exaggeration 1 : 1 or 2 : 1, contour lines, From above, Reset view. Side walls: topsoil green, subsoil ochre.
Sensitivity
the excavation for eleven values of one quantity – slope angle, working space, foundation depths or topsoil – each bar calculated exactly. The red frame is the current value; a click on a bar adopts it. Angles the soil does not permit without analysis are pale.
Dimensions
the dimension chains of the drawing: click a dimension (orange), drag the dimension line to move it, Del or Delete dimension removes it. Measure distance: click two points (they snap to corners and edges, Alt free), then the position of the dimension line. Restore standard dimensions brings back deleted ones. This is how the dimensioning gets into the report.
Stockpiles
both stockpiles with dimensions and volume.
Sensitivity of the excavation to the slope angle as a bar chart
Sensitivity: a click on a bar adopts the value.
Dimensioning of the excavation pit with dimension chains
Dimensions: move, delete, measure your own.

Check against DIN 4124

Below the outputs is Slope according to DIN 4124 Subscription: the standard profile of the highest slope and a checklist – slope angle per soil, slope height (above 5 m a stability analysis is required), berms, working space, ground next to the slope, fall protection, protective strip, distance of vehicles up to 12 t and up to 40 t, access and shoring.

Each item is met, observe (to be observed on site), check or not permitted. Below that the Dimensions per element.

Standard profile and checklist according to DIN 4124
Standard profile of the highest slope and checklist
Table Dimensions per element with bottom edge, top edge, base, depth and slope
Dimensions per element: bottom edge and top edge, base, depth and slope width.

Output and transfer

The menu Output in the header:

  • PDF report Subscription: key figures, plan view, dimensions, sections, views from four directions, stockpiles, shoring, checklist according to DIN 4124, dimensions and all inputs.
  • HTML file with 3D view Subscription: a single file that runs without an internet connection – good for passing on.
  • STL of the excavation pit Subscription for CAD and 3D programs: a closed solid – the body of earth as the 3D view shows it, on top the ground with the excavated pit, vertical side walls all around, a flat base below (0.6 m or 20 % of the greatest depth below the lowest point). The name of the site is engraved in the south wall (front) (if the pit belongs to no site: its designation) – as large as the wall allows; where its top edge falls, the name moves to the high end. The west wall carries a labelled scale bar (for example “10 m”): always a round length, longer or shorter depending on the wall, and exactly as long as labelled. The site layout tool still reads the file as an excavation pit; it leaves out walls, base, name and scale bar.
  • STL with stockpiles Subscription: one single solid – the ground of the excavation pit continues to the east with the same gradient, and the two stockpiles lie on it: width, height and length as in the key figures, slope 1 : 1. On a slope the stockpiles follow the ground (every point lies vertically above it by its height); their volume stays the same. Base and walls are shared, and name and scale bar are engraved as in the “STL of the excavation pit”. The position is an example at true scale, not a site plan; where the stockpiles really lie is shown in the construction sequence plan. For reading into the site layout tool use the “STL of the excavation pit”.
  • STL of the excavated soil Subscription: the soil that leaves the pit, as a solid of its own – on top the ground plane, below the excavated surface. Its volume is the excavation volume on the grid of the file (topsoil and subsoil together).
  • Copy quantities (for Excel) Subscription: excavation, topsoil and subsoil (in situ and bulked), shoring, slope, both stockpiles and the dimension table to the clipboard – paste into Excel with CtrlV, and every number lands in its own cell. The same button is above “Dimensions per element”.
  • Share: share the excavation pit with accounts from your subscription or team. Sharing individual plans
Open menu Output with PDF report, HTML file, STL of the excavation pit, STL of the excavated soil, Copy quantities and Share

To sequence plan Subscription: choose the construction sequence plan (the plan of this location is suggested, otherwise one is created), leave the position x/y in the plan empty – then the pit lies exactly on the location coordinate –, choose side and distance of the stockpiles, tick or untick pit and stockpiles, then Copy. An earlier transfer is replaced. If the plan is currently open, save there first.

Saving and resetting

  • Save CtrlS stores inputs and key figures; next to it are date and time of the last save.
  • ↶ ↷ or CtrlZ and CtrlY cover all inputs.
  • At the bottom of the form “Reset to”: saved state or default values (slope, working space, berms, stockpiles, grid – shape, depths, terrain and soil remain).
  • In every number field ↑/↓ change the value by one step, with Shift by ten.

Purpose, assumptions and limits

Purpose
Estimate excavation quantities, slope geometry, space requirement and stockpiles of an excavation pit early and transparently – as a preliminary design based on the standard values of DIN 4124.
Typical use
Quantities for tender and estimating; checking whether slope and stockpiles fit on the plot; comparing slope against shoring; foundation pits of pylons in power line construction; handing over top edge, base and stockpiles to the construction sequence plan.
For whom
Site management, work preparation and estimating in building, civil engineering and line construction; designers who pre-dimension an excavation pit.
Units
Lengths, depths and heights in m; topsoil in cm; angles in degrees from the horizontal (45° corresponds to 1 : 1); terrain gradient in %; areas in m²; volumes in m³ – “in situ” is the undisturbed soil, “bulked” the soil in the stockpile; rotation in degrees clockwise from north. Both comma and point are accepted as the decimal separator.
Assumptions
  • The terrain is a plane with two gradients (west → east, south → north); it does not represent hollows, edges or slopes in the terrain.
  • The topsoil has the same thickness everywhere and lies parallel to the terrain.
  • The base is the structure plus working space all round. The slope rises from the base edge at the slope angle; at outer corners it runs round the corner (part of a cone), not mitred.
  • Shoring is a vertical wall without thickness; the embedment below the base is not included.
  • Bulking is a fixed factor per soil type (default 1.40 for topsoil, 1.30 for subsoil); the stockpiles are sloped at 45° on all sides.
  • Soil without layering, without groundwater or perched water.
Technical limits
  • No stability analysis (DIN 4084), no design of the shoring, no dewatering, no statement about neighbouring buildings, service lines or traffic loads.
  • Slopes higher than 5 m and angles above the standard value of the soil need an analysis – the checklist says so but does not perform it.
  • The quantities are as accurate as the inputs and the grid spacing. In the example below, the grid of 0.10 m matches the value calculated by hand to two decimal places; very small pits and narrow footings need a finer grid.
  • The length of the stockpiles follows from the geometrically exact solid – the same calculation as in the construction sequence planner. It applies to a stockpile sloped at 45° all round; if the soil lies flatter, the stockpile needs more area.
  • Permitted inputs: Lx and Ly 0.05 to 1000 m, foundation depth 0.01 to 100 m, working space 0 to 50 m, terrain gradient ±100 %, topsoil 0 to 500 cm, bulking 1.0 to 3.0, grid spacing 0.02 to 10 m. Outside these, the page names the field and the range.
Regulations
DIN 4124 (excavations and trenches – slopes, shoring, working space widths), DIN 4084 (stability analysis, to which the checklist refers), DGUV Regel 101-038 (construction work). These are German standards and rules; what counts is always the current edition and the assessment on site. Outside Germany, the local rules apply.
Data protection
What is stored are the inputs and key figures of the excavation pit at the location. An unsaved draft exists only in your browser on this device. The aerial image is fetched by the server from the map service of the German federal state; the service learns the map extent, not your network address. More in the privacy policy (German).

Calculation method, formulas and example

The simulation does not use an approximate formula for the whole pit; it lays the excavated surface as an elevation model on a grid and counts:

  1. Base: per element (rectangle, area of the free shape, footing) the outline of the structure plus working space, at the foundation depth below ground.
  2. Slope: above every point at the horizontal distance d from the base edge, the excavated surface lies h(d) above the base.
  3. Combining: at every grid point the lowest surface of all elements applies, but at most the terrain. Within a shoring area the terrain remains.
  4. Counting: excavation depth t = terrain − excavated surface; volume and areas are sums over all grid cells of spacing Δ.

h(d) = d · tan β    (β slope angle)

With berms, the slope height H is divided into sections of equal height: number of sections = H ÷ step height, rounded up; between two sections lies a horizontal berm. A height of 4.50 m with a step height of 3 m gives two sections of 2.25 m and one berm.

V = Σ t · Δ²     Vtopsoil = Σ min(t, m) · Δ²     Vsubsoil = V − Vtopsoil

m is the thickness of the topsoil, measured vertically (on sloping terrain converted from the thickness parallel to the layer). The excavated footprint is the sum of all cells with excavation.

Vbulked = Vin situ · bulking

Stockpiles: each stockpile is a solid with a rectangular base b × l, height h and 45° slopes; the crest measures (b − 2h) × (l − 2h). You specify base width and height; the simulation determines the length l so that the bulked volume fits:

V = h ÷ 6 · (b · l + bc · lc + (b + bc) · (l + lc))

with the crest bc = b − 2h and lc = l − 2h (never less than 0: a stockpile narrower than twice its height ends in a ridge). The length is at least twice the height.

Shoring: along every edge of the shoring area, the simulation reads the excavation depth immediately in front of the wall every 5 cm. Wall area = sum of the heights × step, mean height = wall area ÷ wall length. Where there is no excavation next to the edge, it does not count as a wall.

For checking by hand – a single rectangle in level terrain, without berms and shoring, with base area A, base perimeter U and depth T:

V = A · T + U · T² ÷ (2 · tan β) + π · T³ ÷ (3 · tan² β)

The first part is the prism above the base, the second the slope wedges along the sides, the third the four rounded corners (together one cone).

Example: structure 10 × 8 m, foundation depth 3 m, working space 1 m, slope 45°, level terrain, topsoil 30 cm
QuantityCalculationResult
Base(10 + 2 · 1) × (8 + 2 · 1) = 12 × 10 mA = 120 m², U = 44 m
Total excavation120 · 3 + 44 · 3² ÷ 2 + π · 3³ ÷ 3 = 360 + 198 + 28.27586.27 m³
Excavated footprint120 + 44 · 3 + π · 3²280.3 m²
Topsoil280.3 · 0.30, less the wedge at the rim where the pit is shallower than 30 cm81.3 m³
Subsoil586.27 − 81.28504.99 m³
bulked81.28 · 1.40 and 504.99 · 1.30113.8 m³ and 656.5 m³
Topsoil stockpilebase 8 m, height 2 m, crest 4 m wide → length from the volume8 × 11.26 m
Subsoil stockpilebase 10 m, height 3 m, crest 4 m wide → length from the volume10 × 33.83 m

For this example the simulation shows the same values with a grid of 0.10 m (excavation 586.27 m³). There are no berms here: at 3 m the slope is not higher than the step height.

Typical input errors:

  • Pit entered instead of structure: Lx and Ly are the dimensions of the structure. The working space is added all round – whoever enters the dimensions of the base counts it twice.
  • Foundation depth too shallow: it reaches down to the base of the excavation, that is, including blinding layer, soil replacement or insulation beneath the structure.
  • Topsoil in metres: the field expects centimetres – 0.3 would be 3 mm.
  • Gradient in degrees: the terrain gradient is in per cent (10 % = 1 : 10 ≈ 5.7°), the slope angle in degrees.
  • Bulking as a percentage: the factor is meant – 1.30 for 30 % bulking, not 30.
  • Grid too coarse: for very small pits or narrow footings halve the grid spacing; if the result no longer changes noticeably, it is fine enough.
  • Angle chosen without soil: set the soil according to DIN 4124 first – steeper than its standard value is only possible with “with stability analysis”, and then the analysis must actually exist.
  • Shoring only drawn: the shoring area has to cover the slope that is to be omitted; whatever lies outside is still sloped.

Keyboard shortcuts in the excavation pit

Key or mouseEffect
1 – 6Plan, Section, 3D, Sensitivity, Dimensions, Stockpiles
Homeshow everything (plan, dimensions) · reset 3D view
?overview of keys and mouse actions
CtrlSsave
CtrlZ / CtrlYundo, redo – while drawing, Ctrl+Z takes back the last corner
↑ / ↓change a number field by one step, with Shift by ten
Enterapply a number in the drawing; close shape or shoring
Esccancel input, drawing or shoring tool
Backspacetake back the last corner (free shape, shoring)
Shiftcompass in 15° steps, shoring in 15° directions, corners of the free shape to 1 cm
Altshoring and measuring without snapping
Deldelete the selected dimension (Dimensions)
← → ↑ ↓rotate the 3D view (click the view first)
+ / - · 0zoom 3D · reset view
Mouse wheel · drag on empty spacezoom · pan (plan, dimensions)
Double-clickfinish drawing · delete a corner of the shoring

Something missing or unclear? Write to info@baustellen.tools.