Escape and rescue plan: what belongs on the sheet

An escape and rescue plan hangs where someone looks in an emergency – and must then be readable without explanation. DIN ISO 23601 governs how the sheet is laid out; whether and where a plan has to be displayed follows from the risk assessment under the German workplace rules.

As of: · baustellen.tools

What is on the sheet

Every sheet has the same parts:

  • the floor plan of the storey with escape routes and emergency exits
  • the viewer's location (“You are here”)
  • emergency and fire safety signs according to DIN EN ISO 7010
  • the assembly point (sign E007) – if it lies outside the floor plan, in the overview plan
  • legend, rules of conduct for fire and accident, and the title block with object, storey, date and plan author

Oriented to the location means: what lies ahead of me is at the top

The plan is rotated so that it matches the viewing direction at the place where it is displayed. For every display location there is therefore a separate sheet – the same floor plan, rotated differently, with a different viewer location. On the rotated sheet, emergency exit signs point in the same direction as in the plan.

Scale and minimum sizes

Length on the sheet in mm = real length in m × 1000 ÷ scale number. The tool first measures how much room header, legend, rules of conduct and title block need, and then takes the largest scale at which the floor plan fits into the remaining field. Regardless of the scale, minimum sizes remain: external walls 1.6 mm, lettering 2 mm capital height, safety signs 7 mm.

Site containers and site office

Container complexes of the site facilities, site offices and accommodation are typical cases: several storeys, external stairs, narrow corridors. As soon as containers are moved, routes are relocated or the assembly point is changed, a new display is needed. Rules of conduct and phone numbers have to be adapted to the site – emergency number, first aiders, extension of the site management.

Example – recalculated by the program

Example project “Stadtquartier Lindenhof”: container complex of the site office with three storeys

Floors: 3“You are here” locations: 3Sheet format: DIN A3 landscape

QuantityCalculationResult
Sheetsone sheet per location, oriented to it3
Scalesthe largest at which the floor plan fits into the plan field1 : 150 · 1 : 100 · 1 : 100
Plan numbersconsecutiveFRP-01 · FRP-02 · FRP-03
Checklistitems the program checks13 items, 13 met

The checklist finds missing mandatory information and drawing errors – whether the escape route on site is clear and short enough is checked by a competent person.

The figures are calculated by the same calculation core as in the application – every time this page is called up.

Limits

  • Not a fire protection concept: the tool does not check escape route lengths, widths, the number of exits or the number of persons.
  • The checklist finds missing mandatory information and drawing errors, not technical deficiencies of the escape route.
  • Not a fire brigade plan to DIN 14095 and not a fire protection plan.
  • Whether a display is needed and where it hangs is decided by the employer's risk assessment; before it is displayed, a competent person checks the plan.

This article is a working aid. It is not legal advice and does not replace specialist planning, a ground investigation report, structural analysis or a check by a competent person. The current editions of the standards and rules named here and the requirements of the client, the network operator and the authorities are authoritative. This is a translation; the rules cited are German and European ones, and the German version of this article prevails.

Sources and standards

  • DIN ISO 23601 (escape and rescue plans).
  • ASR A1.3 (safety and health signage), ASR A2.3 (escape routes and emergency exits).
  • DIN EN ISO 7010 (safety signs).
  • Manual, chapter Escape and rescue plan: choice of scale, minimum sizes, checklist.