Contents
- Basics
- 1Getting started
- 2Projects
- 3Locations
- Plans
- 4Site layout
- 5Escape and rescue plan
- Civil works
- 6Excavation pit simulation
- 7Foundation
- 8Trench
- Tower construction
- 9Tower assembly check
- 10Span (conductor)
- Cable construction
- 11Cable route and cable pulling
- 12Cable drum
- Team, subscription and account
- 13Working together
- 14Subscription
- 15Account
- Help
- 16Phone and tablet
- 17Keyboard shortcuts at a glance
- 18Frequently asked questions and messages
- 19What’s new
7 Foundation
A pad foundation of up to three steps – rectangular or round: concrete, formwork, blinding layer, excavation, backfill and surplus soil, also for several identical foundations.
Creating, calculating, saving
- The excavation first: the foundation stands in the excavation of the location. It can be created as soon as the excavation simulation has an excavation there (location page, Foundation and tower – step by step) and starts with its dimensions: footprint, depth (less the blinding layer), working space, slope, soil and – with four pits – four foundations. The 3D view shows the foundation in this excavation; four foundations stand above its four pits.
- Create: on the location page, the step Foundation or the card Foundation › Create foundation and calculate. There is one foundation per location (or several identical ones); the card then shows number, concrete, formwork, excavation and backfill, and Open takes you back.
- Calculate: at the left the inputs in three groups – Foundation, Founding and pit, Material and soil –, at the right the result. Every change is calculated immediately. For an input that is not permitted, the page names the field and the range; the last valid result stays visible, faded.
- Save or CtrlS stores inputs and result at the location; the time is shown next to it. If someone else has saved in the meantime, the page reports this and overwrites nothing.
- Delete: on the location page in the menu ⋯ of the card. With the location, its foundation is deleted, moved or archived as well.
- Whoever has read-only access in the project can view and calculate but not save.
Inputs
- Number of identical foundations
- all quantities are given per foundation and in total – for example 4 for the corner legs of a tower.
- Steps
- up to three, from bottom to top; the first stands on the founding level. Each is rectangular (length, width, height) or round (diameter, height). One step is a block foundation; slab with pedestal are two.
- Founding depth
- in m from ground level to the underside of the bottom step. If the foundation is taller, it projects above ground; if it is lower, its top lies below ground.
- Blinding layer
- thickness in m (default 0.05). It projects 0.10 m all round beyond the bottom step – at most as far as the working space.
- Working space all round
- in m at the base of the pit (default 0.50). Empty or 0 means: the bottom step is cast against the ground.
- Pit wall, soil
- sloped with slope angle against the horizontal or vertical with shoring. The soil to DIN 4124 determines how steep a slope may be without verification: 45°, 60° or 80°.
- Concrete density, reinforcement ratio
- density in t/m³ (default 2.4) converts the concrete into tonnes. The reinforcement ratio in kg/m³ comes from the structural design; if empty, the calculator shows no reinforcement.
- Bored piles per foundation
- for a pile foundation: number, diameter and length of the piles below the lowest step (which is then the pile cap). The calculator states pile concrete (number · π · D² ÷ 4 · L) and drill spoil (the same volume, in situ and loose) separately; concrete, formwork and excavation pit of the pile cap stay as they are. It does not check bearing capacity, reinforcement, pile spacing and execution (EN 1536) – that is a matter for the structural design. The piles are not shown in the 3D picture. Empty = shallow foundation.
- Reuse, bulking
- With the tick the excavated soil is used for backfilling; without it, all of it is removed. Bulking is a factor (default 1.25) for the volume in the loosened state.
Result
- Four tiles: concrete in m³ and t, formwork area, excavation and surplus soil (in situ and loose) – for all foundations together.
- Section through foundation and pit, to scale: steps, blinding layer, slope or shoring, ground, with width, founding depth and overall height.
- 3D view: foundation, blinding layer and pit as a rotatable picture – the same dimensions the calculation uses. If a tower foot is saved at the location under Tower assembly check, the foundations stand at the legs at the foundation spacing with the feet in them; the location page shows the same picture and saves it as a 3D file (see Tower assembly check › Tower foot). Drag to rotate, mouse wheel or two fingers to zoom, double-click to reset; Oblique view, from above and from the front jump to fixed viewing directions. The pit walls facing the viewer are omitted so that you can look inside. With several identical foundations, one is shown.
- Checklist: build-up of the steps, founding depth, top level, working space, slope angle or shoring. Each item is met, note, check or not permitted.
- Quantities: every quantity per foundation and in total, with unit and calculation. Copy quantities (for Excel) Subscription and Download as PDF Subscription output them.
- The project overview counts the foundations and adds up their concrete.
Purpose, assumptions and limits
- Purpose
- To determine the quantities of a pad foundation quickly and traceably: what is ordered, formed, excavated, reused and removed.
- Typical use
- Tower foundations in overhead line construction (slab, stepped and block foundations per corner leg), column and machine foundations, foundations for masts and signs; tendering, concrete orders, removal.
- For whom
- Overhead line construction and civil works, estimating, site management, work preparation.
- Units
- Lengths in m, areas in m², volumes in m³ (in situ = undisturbed soil, loose = in situ × bulking), concrete also in t, reinforcement in kg, angles in degrees. Decimal comma and decimal point are both accepted.
- Assumptions
-
- The steps are cuboids or cylinders with vertical sides, centred on top of each other. Slopes, haunches and stepped plans are not represented.
- The pit has a rectangular base: the outline of the bottom step (for a round one the circumscribed square) plus working space all round. Sloped means: all four sides at the same angle, without berms.
- Each foundation has its own pit; several foundations in one common pit are handled by the excavation pit simulation.
- Level ground. Placed volume equals in-situ volume: the backfill is compacted to the density of the undisturbed soil.
- The side faces of all steps are formed. If concrete is cast against the ground without working space, the formwork of the bottom step is not needed on site – the figure remains as an upper limit.
- Technical limits
-
- No design: neither stability (overturning, sliding, uplift, bearing failure) nor reinforcement, concrete grade or settlements. Dimensions and founding depth come from the structural design and the ground investigation report.
- Not included: anchor cages, cast-in parts, recesses, joints, earthing, drainage, dewatering, shoring as a quantity.
- The frost-free founding depth of 0.80 m is a customary minimum in Germany; more applies regionally and depending on the soil.
- Permitted inputs: 1 to 500 foundations, length, width and diameter 0.1 to 50 m, height of a step 0.05 to 15 m, founding depth up to 15 m, blinding layer up to 0.5 m, working space up to 5 m, slope angle 10 to 90°, concrete density 1 to 4 t/m³, reinforcement up to 400 kg/m³.
- Regulations
- DIN 4124 (excavation pits and trenches): working space at least 0.50 m, vertical walls without shoring up to 1.25 m, slope angle by soil, verification above 5 m – the same values as in the excavation pit simulation and the trench tool. The volumes are pure solid geometry.
- Data protection
- What is stored: the inputs, a summary of the result and who saved when – at the location, visible to everyone allowed to open the project. The calculator does not ask for personal data. More in the privacy policy.
Calculation method, formulas and example
Concrete and formwork per step with height h:
rectangular: V = L · B · h formwork = 2 · (L + B) · h round: V = π · D² ÷ 4 · h formwork = π · D · h
Pit with base a × b (bottom step plus twice the working space), depth t (founding depth plus blinding layer) and slope angle β:
vertical: V = a · b · t sloped: a′ = a + 2 · t ÷ tan β, b′ = b + 2 · t ÷ tan β, V = t ÷ 6 · (a·b + (a + a′)·(b + b′) + a′·b′)
backfill = excavation − concrete below ground − blinding layer surplus = excavation − backfill
Without reuse the whole excavation is surplus. Loose = in situ · bulking; concrete in t = m³ · density; reinforcement in kg = m³ · reinforcement ratio.
| Quantity | Calculation | Result |
|---|---|---|
| Concrete | 3.00 · 3.00 · 0.80 + 1.00 · 1.00 · 1.60 = 7.20 + 1.60 | 8.80 m³, 21.1 t |
| Formwork | 2 · (3.00 + 3.00) · 0.80 + 2 · (1.00 + 1.00) · 1.60 = 9.60 + 6.40 | 16.0 m² |
| Blinding layer | 3.20 · 3.20 · 0.05 | 0.51 m³ |
| Pit | base 4.00 × 4.00 m, depth 2.05 m; top 4.00 + 2 · 2.05 ÷ tan 60° = 6.37 m | 6.37 × 6.37 m |
| Excavation | 2.05 ÷ 6 · (16.00 + 10.37² + 6.37²) | 56.0 m³ in situ, 70.0 m³ loose |
| Concrete below ground | 7.20 + 1.00 · 1.00 · 1.20 (the pedestal projects 0.40 m) | 8.40 m³ |
| Backfill | 56.04 − 8.40 − 0.51 | 47.1 m³ |
| Surplus | 56.04 − 47.13 | 8.9 m³ in situ, 11.1 m³ loose |
The surplus is exactly what concrete and blinding layer occupy in the ground. With these inputs the calculator shows the same values.
Typical input errors:
- Steps entered from top to bottom: the first step is the bottom one. If a larger one sits above a smaller one, the checklist says so.
- Founding depth confused with overall height: what is meant is the dimension from ground level to the underside of the foundation, not its height.
- Dimensions in centimetres: all lengths are metres (0.80, not 80).
- Number forgotten: a tower on four pad foundations needs the number 4 – otherwise the quantities of one foundation are shown.
- Bulking as a percentage: enter 1.25, not 25.
- Reinforcement estimated: the ratio should be entered from the structural design; otherwise leave the field empty.
Nothing found. Try another word – “fence” instead of “fencing”, say – or look in the <a class="hdb-siehe" href="/en/manual/faq">frequently asked questions.
Something missing or unclear? Write to info@baustellen.tools.