Contents
- Basics
- 1Getting started
- 2Projects
- 3Locations
- Plans
- 4Site layout
- 5Escape and rescue plan
- Civil works
- 6Excavation pit simulation
- 7Foundation
- 8Trench
- Tower construction
- 9Tower assembly check
- 10Span (conductor)
- Cable construction
- 11Cable route and cable pulling
- 12Cable drum
- Team, subscription and account
- 13Working together
- 14Subscription
- 15Account
- Help
- 16Phone and tablet
- 17Keyboard shortcuts at a glance
- 18Frequently asked questions and messages
- 19What’s new
2 Projects
Create projects, enter locations, see everything at a glance and output it all together as PDF.
Project overview
The page Projects is the start page after logging in.
- Invitations to other people’s projects are at the top with Accept and Decline. More about invitations
- The key figures in one line: projects, locations, projects with a licence, the free allowance (“Without subscription: 1 of 1 used”) and Your subscription – projects and locations used out of those booked; a click leads to the account page.
- Each project is a card: name, licence, team, number of locations, construction period and – in the colours of the tools – how many construction sequence plans, excavation pits and rescue plans it has. Next to the excavation pits is the excavation of all pits of the project Subscription. At the bottom is the latest activity – what happened last and by whom – and who owns the project.
- 2 notes on a card means: in two results of the project something is open – clashes in a construction sequence plan, missing mandatory details in the checklist of a rescue plan, or an excavation pit that could not be calculated. On the project page the same note appears at the location concerned.
- The badges: in subscription · Quota · not activated (there would be a free place in the subscription) · without subscription · more than booked · Subscription ended · Team · 3 or in the team.
- Recently opened appears above the cards as soon as you have opened a tool: the last four locations with their tool – a click leads straight back into the site layout tool, the excavation pit or the rescue plan. The list is remembered by the browser, not the server: it applies per device and disappears when you log out.
- From five projects on, a search and the filters All, Own, Shared with me, Licensed appear. / jumps into the search, Esc clears it; search term and filter remain when you come back from a project.
- A project of your own without locations has the bin at the bottom right for deleting it. To delete a project with locations, delete the locations first.
- Below the cards, Archive leads to the projects you have put away. Archiving and restoring
New project
- New project at the top right. A small form opens (without any projects it is open already).
- Enter a name, for example “New warehouse”.
- If there is a free place in your subscription, Add to the subscription straight away is ticked; if you have several subscriptions or quotas, choose one.
- What this project needs: leave the ticks at the categories the project needs – Plans (site layout, escape and rescue plan), Civil works (excavation pit simulation, foundation, tower foot – the tower foot only together with Tower construction), Tower construction (tower assembly check, span (conductor) for the span), Cable construction (trench, cable route and cable pulling, cable drum). All are preselected. Deselected ones do not appear at the locations. You can change the selection later on the project page under ⋯ More › Choose tools.
- Create project – the project page opens. You enter the first location there.
Project page
- Header: name and description, plus Project overview as PDF Subscription, All PDFs as ZIP Subscription and Team. Under ⋯ More you find As KML Subscription, For MS Project Subscription, Archive (owner only) and Rename (opens name and description). The bar below the key figures jumps to the sections of the page.
- Choose tools (under ⋯ More): which categories of tools this project needs. Deselected ones no longer appear for creation at its locations – this keeps the location page clear. Whatever already exists at a location stays visible there and is not deleted; the selection states for each tool at how many locations it has been created. If all tools are selected, those added later apply as well.
- Key figures: locations (in a subscription: used out of booked across all projects of the subscription), construction period, excavation, licence, team, created by.
- Locations: one compact row per location with number, name and coordinate; next to the name it says when something at the location was last changed, and – if something is open – 1 note. Below that, one coloured tag per existing tool (construction sequence plan, excavation pit, rescue plan, trench …) – a click opens it. Tools and key figures expands the fields of all tools: filled with key values and links (Draw, Evaluation, Open, PDF), or empty with “Create …”. Expand all next to the heading opens all locations at once.
- Distance and span: if two consecutive locations have coordinates, the foot of the row shows the distance to the next location (“229 m to Mast 49”). Calculate span creates the span of the span tool between the two locations there – the span length comes from the coordinates; afterwards sag and conductor tension appear in the row. Span (conductor)
- From eight locations on, Search location appears next to the heading – by name, number or remark; / jumps into it.
- The arrows ↑ and ↓ in the row change the order – the page stays where it is; the menu ⋯ offers Open location, Change name and coordinate, Archive location and Delete location (after a confirmation, together with its tools).
- Site sketch at the right: all locations with a coordinate over the aerial image of the German federal state (open data), with north arrow and scale. A click on a point opens the location. If the aerial image fails, the caption names the reason, with Try again next to it.
- Further down: Construction sequence across all locations, Excavation pits compared, Latest activities and at the end Licence and team. Licence and team
- Latest activities lists the twelve most recent steps in the project with date, time and person: location created, renamed, moved, archived or deleted, tool created or deleted, construction sequence plan, excavation pit or rescue plan saved. Saving several times within half an hour appears as one entry. The list begins on the day it was introduced – earlier events are not in it.
Cockpit: locations from left to right
The project page starts with the cockpit – you read and scroll from left to right, in the order of the locations.
- Top left, the figures: locations, length of the route (straight lines from location to location), calculated spans, open notes – and per category at how many locations something of it exists: green without findings, orange with findings, blue in progress.
- Top right, the map: the locations with coordinates over the aerial image, connected in their order. Mouse wheel or +/− zooms, dragging pans, show all resets. A click on a point scrolls the band to its tile; pointing at a tile highlights its point.
- The band of tiles: one tile per location with number, name and open notes. In it the tools by category – every line is quick access and most important figure at once: a click opens the tool, the coloured edge shows the state (green fine, orange note, red does not fit, blue created). Whatever does not exist yet is dashed with create. Mouse wheel, dragging or the arrows ‹ › scroll the band.
- Between two tiles, the span: the straight-line distance to the next location; if the span is calculated, sag and tension are shown and the line sags. Calculate span creates it, Open span leads into it.
- Below, the longitudinal profile of the line: one continuous, elongated diagram across all locations with a coordinate, in the order of the project. Brown is the ground surface from the terrain model on the straight line from location to location, black the tower at each location with its height and cross-arms (from “Tower assembly check”), blue the conductor lines from cross-arm to cross-arm – the lowest to the lowest, the next to the next. If the span has been calculated, the lines sag by its greatest sag (highest conductor temperature of the sag table or ice load – stated at the span) and the smallest distance of the lowest line to the ground is shown in red; otherwise they are dashed as chords. The span calculator also supplies the insulator string (the lines hang lower by its length) and the crossed objects (violet, with the distance of the conductor line above their top). Grey dashed, the earth wire runs as a chord from tower top to tower top where the top rises above the uppermost cross-arm; if the foundation rises above the ground, the tower stands on its top. Without a tower assembly the profile assumes one cross-arm 30 m above ground (dotted, “30 m assumed”); a tower assembly without a cross-arm is attached at the tower top. Lengths are to scale, heights exaggerated; −, + and whole line change the length scale, the pointer reads chainage, ground level and conductor height above ground, a name jumps to the tile. Print profile outputs only the longitudinal profile – landscape, a long line in strips from location to location one below the other; when the whole page is printed it also appears in strips at page width. Search location above the strip (name or number, with suggestions) jumps to the tile and brings the location to the centre of the longitudinal profile – meant for long lines. In a project without tower construction the profile shows the ground only. Limits: an overview, not a verification of minimum clearances – the terrain model knows neither vegetation nor buildings, roads or crossing lines; the sag is the greatest of the sag table (up to 80 °C, ice load as far as entered) – higher operating temperatures, wind and conductor creep are missing; crossings are shown only as far as entered; all conductors of a span have the same sag.
- Profile plan as PDF Subscription: the button above the longitudinal profile outputs the line as a drawn profile plan – A3 landscape, sheet by sheet from tower to tower. Every sheet has a frame, the height axis in m a.s.l. above a datum level on the left, the ground, the towers with cross-arms and foundation, the conductors with the maximum sag (as a dashed chord without a calculated span), the earth wire, the minimum ground clearance per span and the crossings entered. Below, in true position, the bands: tower with base level and line angle (angle between the spans, 180° = straight), chainage (km + m), ground level, attachment of the lowest conductor, span length, maximum sag, minimum ground clearance, conductor with ice load and wind zone. On the right: basis and limits, legend, scale bar, sheet overview and the title block with project, section, scales, date, sheet number and author. The program chooses the scale: for lengths the smallest of 1 : 1000, 2000, 2500, 5000 … at which every span fits on one sheet and on average at least two spans are on a sheet; for heights the smallest at which ground and tower tops fit into the profile area. Like the longitudinal profile, the plan is an overview, not a verification of minimum clearances – this is stated on every sheet.
- At the end: Add location opens the form below.
The detailed List of locations – search, sort, all key figures per location – unfolds below.
Further down, Quantities across all locations summarises what the tools have saved: per location the number of foundations, concrete, formwork and pile concrete (foundation), excavation (excavation simulation – marked F from the foundation tool where there is no excavation pit), tower height (tower assembly check) and span length of the calculated span (span (conductor)), with the totals below. Copy table puts it on the clipboard for Excel. The table is available in subscribed projects.
Creating locations
- New location on the project page.
- Name, for example “North plot” or “Pylon 12”.
- Coordinate in one of the formats below. Leaving it empty also works – then there is no aerial image and no site sketch; you can add it later on the location page.
- No. is pre-filled consecutively and can be changed freely, for example “M12”.
- Then open: the location page or a tool straight away.
- Template (as soon as there are locations with plans): choose an existing location – its construction sequence plan, excavation pit and rescue plan come along as copies. Name, coordinate and origin are those of the new location; the plan fetches the aerial image anew there. Create location.
| Format | Example |
|---|---|
| WGS84 in decimal degrees, with point or comma | 51.5136, 7.4653 · 51,5136 7,4653 |
| WGS84 in degrees, minutes, seconds | 51°30'49" N, 7°27'55" O |
| Link from Google Maps or OpenStreetMap | the address from the browser’s address bar |
| ETRS89 / UTM 32 or 33, with or without zone | 32U 391234 5709876 · 32391234 5709876 |
| Gauß-Krüger, zones 2 to 5 (accurate to about 1–3 m) | 2591234 5712345 |
How many locations you can create depends on the subscription: in projects in a subscription as many as are free in it (they are shared among all projects of the subscription), otherwise 1 across all projects without a subscription. When the limit is reached, the form says so and shows the way to the subscription.
Evaluation across all locations
As soon as there are construction sequence plans, the project page summarises them under Construction sequence across all locations: total construction period, plans and construction phases, largest simultaneous area demand with date, sum of the location peaks, areas and lines, equipment with days in use and the findings of the check. The chart shows the area demand per location over time.
Excavation pits compared Subscription shows all calculated pits as bars – switchable between Excavation, Maximum depth and Top edge, with the foundation depths per footing below. A click on a bar opens the excavation pit.
Sorting locations
Above the location list, Sort rearranges the list – by name, by last change, by number of notes, by values from the construction sequence plan – start, end and length of the construction period, peak area demand, total areas and lines, number of areas, construction phases, equipment and conflicts – and Subscription by values of the excavation pit: excavation, depth and pit area. ⇅ reverses the order. Locations without the value come last.
This only changes the view in your browser. The order of the project – for PDF, KML and the connecting line – stays as it is; the arrows for moving reappear under “Order in the project”.
Archiving and restoring
Whatever is finished or dormant goes into the archive: nothing is deleted, but it no longer takes up a place.
- Archive location – project page, menu ⋯ of the location. The location moves, with its construction sequence plan, excavation pit and rescue plan, to Archived locations at the end of the location list. It no longer counts among the locations of the project: not in the subscription, not in evaluation, schedule, PDF and KML.
- Archive project – project page, button Archive. The project disappears from the project overview and is listed under Archive. In the subscription, its project place and its locations become free; the team is suspended.
- Restore brings everything back as it was – the same location with the same tools, the project with its team. There has to be room for it: a free location for a location, a free project place and room for its locations for a project. If that is not enough, the page says what is missing.
- Only its owner archives and restores a project; locations can also be handled by a project administrator. Roles in the team
A project that still has archived locations cannot be deleted – restore them first and then delete them.
Project reports
Project overview as PDF Subscription: a report in landscape A3 covering all construction sequence plans – key figures, location table with position, overview of dates, area demand per location, per area type and per calendar week, schedule and deployment list of the equipment, quantity take-off and the check per location.
All PDFs as ZIP Subscription packs all documents of the project into one file. The package is built in the background: below the buttons it says what is being worked on (“Excavation pit 3 of 12: Mast 7”), and at the end the download starts by itself. You may reload or leave the page meanwhile.
| File in the ZIP | Content |
|---|---|
00 Project overview.pdf | the report on all construction sequence plans |
01 …pdf, 02 …pdf | per construction sequence plan, the PDF of the location |
BG 01 Location – Excavation pit.pdf / .html | per excavation pit, the PDF report and the HTML file with 3D view |
FRP 01 Location – Escape and rescue plan.pdf | per rescue plan, all notices |
Not included.txt | only if something is missing: which document and why |
The file names follow the language in which you request the package; “Location” stands for the name of the location.
Schedule: construction phases of all locations
Below the site plan, the project page shows the schedule: one row per location with its construction phases in their colours; the red line is today. A click on it (or Edit schedule) opens the editing page.
- Expand: the arrow in front of a location shows its construction phases as separate rows, with areas and equipment that have their own dates hatched below. Expand all opens all locations.
- Move: dragging a bar moves the construction phase. The dark bar of a location moves all its phases at once. Areas with their own dates move along when their phase is moved as a whole.
- Start and end: drag the ends of a bar – or click the bar and enter the dates. That is also where you change name and colour.
- Adding and deleting: + Construction phase below the phases of a location adds a new one after the last. The cross next to the name (or Delete in the dialog) removes a phase; its areas stay in the plan, just without a phase.
- Scale: days, weeks or months. Today jumps to the current day.
- Keyboard: left/right arrow moves the selected bar by one day, with Shift by one week, with Alt only its end. Enter opens the dates, Del deletes, Ctrl+Z undoes.
Nothing is saved immediately: changed locations carry a dot, Save writes them into their construction sequence plans, Discard brings back the saved state. Locations that someone else is currently editing are locked with a padlock; if a plan has meanwhile been saved elsewhere, the page reports this and shows it afresh.
Schedule for Microsoft Project
For MS Project Subscription (on the project page and in the schedule) downloads the saved schedule as an XML file. In Microsoft Project: File › Open, choose the file type XML format and open the file (as a new project). ProjectLibre and GanttProject read it as well.
- Outline: the project, below it one summary task per location, containing its construction phases. Areas and equipment with their own dates are listed under their phase, those without a phase directly under the location.
- Dates in calendar days as in the site layout tool: the file brings along the calendar “Baustelle (7 Tage)” (site, 7 days), and every task starts fixed on its date (“start no earlier than”). Descriptions are attached to the task as a note.
- There are no links between tasks – you set those yourself in Project if you want to go on calculating with the plan.
- The file is the same in both languages; its labels are German.
Project as KML for Google Earth and GIS
As KML Subscription downloads the whole project as one file for Google Earth, QGIS, ArcGIS or map apps – correctly positioned in WGS84. Structure:
- Connection of the locations: a line through all locations with a coordinate, in the order of the project – for example along the route of a power line.
- Per location a folder with its point and – if it has a construction sequence plan – per construction phase a subfolder with its areas and lines. Areas and equipment with their own dates are in the folder for own dates within it, areas without a phase under the whole construction period.
- Excavation pit: top edge and base as separate areas, from the excavation pit in the construction sequence plan.
Every folder and every area carries its time span: in Google Earth the time slider at the top shows what stands when. A click on an area names type, quantity, time span, equipment and remark. If a plan has no georeference, its origin lies on the coordinate of the location. The folder names in the file are German in both languages.
Nothing found. Try another word – “fence” instead of “fencing”, say – or look in the <a class="hdb-siehe" href="/en/manual/faq">frequently asked questions.
Something missing or unclear? Write to info@baustellen.tools.